Laserfiche WebLink
Preliminary Plat: <br />August 8, 2003 <br />Page 8 of 9 <br /> · <br /> <br />Ramsey Town Center Addition <br /> <br />Provide invert elevation'and direction of connection along with calculations to <br />justify pipe sizes for parking lot drainage of parking lots. <br />There appears to be grading activity on the railroad property. This activity shall <br />not occur until evidence of a permit from the railroad authority. <br /> <br />Sheet 21 of 83 <br />· Where is the placement of the TuffTurf? <br />· Where is the placement of the Netlon? <br />· Key of proposed sanitary sewer is incomplete. <br />· A conditional use permit is necessary to import more that 400 c.y. of material. <br />· Use reinforce silt fence for beehive protection, <br />· Add and approved by the City Engineer to the last note on the page. <br /> <br />Sheet 25of83 <br />· Provide invert and size information on all drainage facilities that will be impacted <br /> as a result of the project. Provisions shall be made to protect existing drainage <br /> patterns. <br />· Add rip rap to the 30" RCP into Cell 2 <br /> <br />Sheet 27 of 83 <br />· Service Drive ROW width has been agreed to be 100' wide. <br />· Add sidewalk on north side of service drive. <br /> <br />Sheet 28 of 83 <br />· Add walk to each side of commercial street at Industry (section 10). <br />· Add walk to Sunwood Drive (section 7). <br /> <br />Sheets 33-74 of 83 <br />· Plans/Profiles sheets for storm sewer need to be added <br /> <br />There will be an additional review letter from the City's Consulting Engineering <br />Firm, Hakanson Anderson that will also need to be addressed by the applicant. <br /> <br />15. Developme. nt Agreement. As you know, the City and the develOper have been <br /> working on creating a draft of the Development Agreement for the Town Center <br /> project. The Development Agreement will need to be approved at the time of final <br /> plat. <br /> <br />-313- <br /> <br /> <br />