Laserfiche WebLink
Discovery Garden at Alpine Park, Scope of Services Proposal, May 7, 2003 <br /> <br />5. Coordination meeting/wor~,.king session to select materials palette for the garden especially <br /> including recycled and reused materials; to discuss phasing of construction given available <br /> funds; and begin cost estimation process (Ftanagan, Christensen, landscape architect) <br /> <br />6. Ongoing communications with Mark Boos, Parks & Utilities Supervisor indudin§ cwo meet- <br /> ings: an introductory meeting with Keith Christensen during site visit; and the presentation <br /> of schematic design materials (Fianagan, Christensen, landscape architect) <br /> <br />Products for Schematic Desisn Phase: <br /> <br />· Scaled drawings of refined site layout, and design concepts for interactive game, to be <br /> presented on one or cwo - 24" x 36". display boards and/or I" x'l 7" sheets, as <br /> appropriate, along with descriptive cexc <br /> <br />Subtotal Schematic Design Phase <br /> <br />Flana§an 25 hours (~ $T5.00/hour = $ 1875.00 plus travel (two visits, $i20.00) = <br />Chris,orison 32 hours ~ $TS.00/hour = $ 2400.00 plus r_ravel (two visits, $ 100.00) = <br /> <br />Landscape Arch. 14 hours ~ $75.00/hour = $ 1050.00 plus travel (one visit, $250.00) = <br />Allowance for Reimbursable~ <br /> <br />(including photo§raphy, scans/electronic files, printing and mounting of display bo.ards, etc.) <br /> <br />$ 6045,00 <br /> <br /> $ 1995.00 <br /> $ 2500.~0 <br /> $ { 300~00 <br /> $ 250.00 <br /> <br /> Design Development Phase <br /> <br />Details of five componen~-~, of Mas~er Plan, details of in~erac-~ve game and art elements, <br />cosc esrJmation and phasing of cons'u-uC'Uon <br /> <br /> I. Develop details of components: Greenway Connection/Hiking Loop; Overlooks; Play Area; <br /> and Places for Three Friends; as well as plant list for Butterfly Garden (Ftanagan) <br /> <br />2. Continue design of interaCtive game and specific art elements to be integrated into the <br /> garden, and distinct a~ elements not a part of site constru~ion (Christensen) <br /> <br />3. Detail specific art elements to be integrated into construction of the site iFianagan) <br /> <br />4. Produce cost estimation of five components including integrated ar~ elements, as well as <br /> estimation of distinct art elements; make recommendations regarding phasing (landscape <br /> architect, Flanagan, Christensen) <br /> <br />S. Ongoing communications with Mark Boos, Parks & Utilities Supervisor including cwo <br /> meetings; one co review design development materials while in progress, and one to <br /> present final materials including cost estimate and phasing recommendations <br /> (Fbnagan, Chris,orison) <br /> <br /> <br />