My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 01/11/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:38:02 PM
Creation date
9/8/2003 9:10:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br />il <br /> <br /> Pay Estimate #1 <br />Sunfish Lake Blvd. San. Sewer Watermain Extension <br /> <br />12/'27/99 <br /> P,~ 629 <br /> <br />December 27, 1999 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />RE: Sunfish Lake Blvd. San. Sewer Watermain Extension <br />Contractoc W,B, Miller <br />Contract Amount: $141,553.50 <br />Award Date: 12/14/99 <br />Completion Date: June 15, 2000 <br /> <br />Dear Council Members: The following work has been completed on the above referenced pmiect <br />~ID SCHEDULE A - SANITARY SEWER <br /> <br />...... Estimated Contract Used to <br /> Item It Item Description Quantity Unit Pflce Amount Date Extension <br /> I 8' PVC SDR 35 (all depths) 1360: LF $12.20 /LF $16~592.00 1347 $16,433.40 <br /> 2 48' Dia. Manhole w/c~sting (0' to 8') 5 EA $1~580.00 /FA $7~900.00 5 $7~900.00 <br /> 3 ,Excess Manhole Depth 48' Diameter (over 8') 30 LF $85.00 /LF $2~550.00 25 $2~125.00 <br /> 4 '8'x6'Ser~iceWye 5 EA $25.75 /FA $128.75 3 $77.25 <br /> 5 IConnect to Existing San. Sewer I EA $8~200.00 /FA $8,200.00 I $8,200.00 <br /> 6 16' PVC Bond 5 EA $5.25 /FA $25.25 3 $15.75 <br /> 7 16" PVC SDR 35 Service Pipe 60 LF $37.50 /LF $2,250.00 9 $337.50 <br /> <br />TOTAL BID SCHEDULE A: <br /> <br />$37,647.00 $35,088.90 <br /> <br />BID SCHEDULE B - WATERMAIN <br /> <br />8 6' DIP CL 52 60 LF $43.80 /L.F $2,628.00 $0.00 <br />9 8' DIP CL 52 200 LF $18.10 /LF $3~620.00 $0.00 <br />10 12' DIP CL 52 1840 LF $23.95 /LF $44~068.00 $0.00 <br />11 6" GVw/valve Box 9 EA $390.00 /E.A $3~510.00 $0.00 <br />12 8" GV w/Valve Box I EA $550.00 /EA $550.00 $0.00 <br /> <br />13 12' GV w/Valve Box 4 EA $955.00 /EA $3~820.00 $0.00 <br />14 Hydrant 4! EA $1r550.00 /EA $6r200.00 $0.00 <br />15 Ductile & Gray Iron Fittings 35001 LB $0.75 /LB $2~625.00 $0.00 <br /> ,Jack z~ ula. ~[eel ~.,aslng rope unaer <br />16 Lake Blvd. 75 LF $1~1.00 /t.F $9~075.00 $0.00 <br />17 Hydrant Extension 2 LF $360.00 /LF $720.00 $0.0~ <br />18 Valve Box Extension 4 LF $51.00 /LF $204.00 i $0.00 <br />19 connect to Existing Watermain 2 EA $360.00 /F_A $720.00 $0.00 <br /> <br />TOTAL BID SCHEDULE B: <br /> <br />$77,740.00 $0.00 <br /> <br />PEI-! <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.