Laserfiche WebLink
Mn/DOT Agreement No. 79780-P <br /> <br />ARTICLE III - PAYMENT OF CITY COST SHARE <br /> <br />Section A. Estimate and Advancement of the City=s Cost Share <br /> <br />As the City=s share of the construction engineering costs incurred by the State, the City will pay to the State the <br />following percentages of the costs of the Construction to be performed under this Agreement: The City will pay <br />the State 8% of the contract costs for those roadway portions described in Article II, Section A; The City will pay <br />the State 4% for the contract costs for the city sewer and water main items described in Article II, Section B. It <br />is estimated that the City's share of the construction engineering costs is the sum of $60,800.00 based on these <br />estimates: Roadway portion ($655,000 x 0.08 + $52,400) and Sewer/Water ($210,000 x 0.04 = $8,400) for grand <br />total of $60,800.00. <br /> <br />Prior to the State beginning any construction engineering for the Construction covered under this Agreement, and <br />after the following conditions have been met, the City must advance to the Commissioner of Transportation the <br />City=s total estimated construction engineering cost share of $60.,800.00. <br /> <br />1. Execution and approval of this Agreement and the State=s transmittal of same to the City. <br /> <br />2. Receipt by the City of a written request from the State for the advancement of funds. <br /> <br />Section B. Documents To Be Provided .by the City. <br />After the Construction has been completed, the City must provide the State=s Metropolitan Division Engineer at <br />1500 West County Road B2, Roseville, Minnesota, 55113 or his/her designee, with the following documents: <br /> <br />1. A copy of the City contractor=s final invoice which includes all Construction costs. <br /> <br />A copy of the endorsed and canceled City warrant or check paying for final Construction, or computer <br />documentation of the final warrant issued, certified by an appropriate City official that final construction <br />contract payment has been made. <br /> <br />Page 3 of 6 <br /> <br /> I <br /> ! <br /> I <br /> I <br />I: <br /> I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br /> <br />