Laserfiche WebLink
I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> COST ESTIMATES FOR <br />CITY PROJECTS ASSOCIATED WITH T.H. #47 STP PROJECT <br />January 7, 2000 <br /> <br />Sunwood Drive Extension to T.H. #47 <br /> <br />Construction <br />Engineering Design ~ 10% <br />Land Acquisition <br />Construction Engineering/Inspection ~ 8% <br />TOTAL <br /> <br />295,963 <br /> 29,596 <br /> 10,000 <br /> 23,677 <br /> 359,236 <br /> <br />Watermain Looping <br /> <br />Construction <br />Engineering Design ~ 10% <br />Construction Engineering/Inspection ~ 8% <br />TOTAL <br /> <br />191,502 <br /> 19,150 <br /> 15,320 <br />235,972 <br /> <br />.San. itary Sewer <br /> <br />Construction <br />Engineering Design ~ 10% <br />Construction Engineering/Inspection ~ 8% <br />TOTAL <br /> <br />76,685 <br /> 7,668 <br /> 6,135 <br />90,488 <br /> <br />\\P,A_FS I \VOLl\users\Cily Shared File\ENGINEER\98-14TH.#47\Related Projects Cost Estimate.doc <br /> <br /> <br />