Laserfiche WebLink
I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CASE <br /> <br />AWARD ENGINEERING CONTRACT TO PREPARE PLANS AND <br />SPECIFICATIONS FOR WATER TOWER NO. 2 AND REPAINTING OF THE <br />EXISTING WATER TOWER <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />Two critical needs for the City's growing water utility include constructing an additional well to <br />increase the City water supply source, and a second elevated water tower to increase storage. <br />'~'ou will recall that in December the City awarded the well design and specification preparation <br />to E.H. Renner, Inc. (The plans and specifications have been completed and are on the consent <br />~genda for authorizati~;~.) <br /> <br />rroposals have beck" r.~quested from two fi,,'ns specializing in tangos and water storage 5~lities. <br />~rhc proposals are due at the end of the business day on Fric.'.ay, January 21. St,.fi7 will be <br />-'~viewing the proi~c~s~l~ early the week of January 24 and wii1 Lv~ve a recommendat-: ~n to be <br />re~ented at themee," .~., <br /> <br />3e¢ommendation: <br /> <br />To be presented at [~ ' meeting. <br /> <br />Council Action: <br /> <br />Based upon discus?.'.:n. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />City Attorney <br />Director of Public Works <br /> <br />CC: 01/25/00 <br /> <br />G:\USERS\CITYSIt-I \ENGINEER\99-64 Water Tower #2L,~ward Contract for Plans Specs.doe <br /> <br /> <br />