My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/09/2000
Ramsey
>
Public
>
Agendas
>
Council
>
2000
>
Agenda - Council - 05/09/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:43:23 PM
Creation date
9/8/2003 10:51:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/09/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br />I <br /> I <br /> <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br /> Pay Estimate #2 <br />Sunfish Lake Blvd. San. Sewer Watermain Extension <br /> <br />4/1 Er'00 <br />RA629 <br /> <br />Apdl 18, 1999 <br />Honorable Mayor & City Council <br />City of Ramsey <br />15153 Nowthen Blvd. NW <br />Ramsey, MN 55303-6197 <br /> <br />RE: Sunfish Lake Blvd. San. Sewer Watermain Extension <br />Contractor: W.B. Miller <br />Contract Amount: $141,553.50 <br />Award Date: 12/14/99 <br />Completion Dale: June 15, 2000 <br /> <br />Dear Council Members: The following work has been completed on the above referenced project <br /> <br />BID SCHEDULE A - SANrrARY SEWER <br /> <br /> Estimated Contract Used to <br />Item # Item Description Quantit~ Unit Price Amount Date Extension <br />1 8' PVC SDR 35 (all depths) 136(; LF $12.20/LF $16,592.00 1367 $16,677.40 <br />2 48" Dia. Manhole w/casting (0' to 8') 5 EA $1,580.00 ./EA $7,900.00 5 $7,900.00 <br />3 Excess Manhole Deplh 48" Diameter (over 8') 30 LF $85.00 /LF $2,550.00 25 $2,125.00 <br />4 8" x 6' Service Wye 5 EA $25.75 /EA $128.75 3 $77.25 <br />5 Connecl to Existing San. Sewer 1 EA $8,200.00 /EA $8,200.00 1 $8,200.00 <br />6 6" PVC Bond 5 EA $5.25 /EA $26.25 3 $15.75 <br />7 6" PVC SDR 35 Service Pipe 60 LF $37.50 /LF $2,250.00 9 $337.50 <br /> <br />TOTAL BID SCHEDULE A: <br /> <br />$37,647.00 $35,332.90 v/' <br /> <br />BID SCHEDULE B - WATERMAIN <br /> <br />8 6" DIP CL 52 60 LF $43.80 /LF $2,628.00 150.5 $6,591.90 <br />9 8" DiP CL 52 200 LF $18.10 /'LF $3,620.00 203 $3,674.30 <br />10 12" DIP CL 52 1840 LF $23.95 /'LF $44,068.00 1833 $43,900.35 <br /> <br />11 6' GV wJalve Box 9! EA $390.00 /EA $3,510.00 6 $2,340.00 <br /> <br />12 8" GV wNalve Box 1 ! EA $550.00 /EA $550.00 1 $550.00 <br /> <br />13 12" GV wNalve Box 4i EA $955.00 /EA $3,820.00 5 $4,775.00 <br />14 Hydrant 4 EA $1,550.00 /EA $6,200.00 2 $3,100.00 <br /> <br />15 Ductile & Gray Iron Fittings 3500 LB $0.75 /LB $2,625.00 5210 $3,907.50 <br /> JaCK Z4- I Jla. ~[ee) t.,as~g r'ipe unoer bun~sn <br />16 Lake Blvd. 75 LF $121.00 /LF $9,075.00 75 $9,075.00 <br />17 Hydrant Extension 2 LF $360.00 /LF $720.00 0 $0.00 <br />18 Valve Box Extension 4 LF $51.(~)0 /LF $264.00 0 $0.00 <br />19 Connect to Existing Watermain 2 EA $360.00 /EA $720.00 3 $1,080.00 <br /> <br />TOTAL BID SCHEDULE B: <br /> <br />$77,740.00 $78,994.05 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.