Laserfiche WebLink
Pay Estimate #2 <br />Sunfish Lake Blvd. San. Sewer Watermain Extension <br /> <br />BID SCHEDULE C - RESTORATION <br /> <br /> Estimated Contract Used'~o <br />Item # Item Description Quantity Unit Price Amount Date Extension <br />19 Remove Bit. Pavement 600 SY $3.10 /SY $1,860.00 300 $930.00 <br />20 Relocate Mailbox Support 1 EA $75.00 /FA $75.00 0 $0.00 <br />21 Sawing Bit. Pavement (Full Depth) 300 LF $3.10 ~.F $930.00 0 $0.00 <br />22 Aggregate Base Class 5 25(; TN $1_7.75 /TN $4,437.50 120.8 $2,144.20 <br /> <br /> 23 Type 41 Wearing C~)urse Mixlure 12C TN ,$.52.00 /TN $6,240.00 0 $0.00 <br /> <br /> 24 Sodding Type Lawn 100C SY $2.,~5 /SY $2,550.00 0 $0.00 <br /> 25 Seeding (includesled. & mulch) 1,5 AC $1,550.00 /AC $2,325.00 0 $0.00 <br /> 26 Construction Signing 1; LS $2,775.00 /t.S $2,775,00 I I $2,775.00 <br /> 27 Topsoil Borrow 3OC CY $5.15 /CY $1,545.00 I 0 $0.00 <br /> 28 Remove Concrete Apron 6(; SY $7.15 ISY . $429.00 I 0 $0.00 <br /> 29 Install 6' Concrete Apron 60 SY $50.00 /SY $3,000.00 0 $0.00 <br /> <br />TOTAL BID SCHEDULE C: <br /> <br />$26,166.50 <br /> <br /> 0.00 <br /> <br /> 5.00 <br /> <br /> " <br /> <br /> derision <br /> <br /> "' $o oo <br /> <br /> $6,560.00 <br /> <br />$126,756.15 <br /> <br /> $2,201.~ <br /> <br /> ~ 829~ <br /> <br />CHANGEORDER#1 <br /> <br /> Estimated Contract Used to <br />item # Item Description Quantit)/ Unit Price Amount Date Extension <br /> Remove & Salva,qe Chainlink Fence 160 LF $3.00 /LF $480.00 160 $480.00 <br /> Install Salvage Chainlink Fence & Gate 14{; LF .$7.00 /t_F $980.00 140 $980.00 <br /> Remove & Salvage White Gales & Log Chain <br /> Fence 140 LF $2.00 /LF $280.00 0 ,.. $0.00 <br /> Install White Gates & Log Chain Fence 100 LFi $3.00 /t.F $300.00 0 $0.00 <br /> Reconstruct Manholew/outside Drop I FA I $5,100.00 lEA $5,100.00 1 $5,100.00 <br /> <br />TOTAL CHANGE ORDER 1: <br /> <br />SUMMARY OF BIDDING: <br /> <br /> BID SCHEDULE A, SANITARY SEWER: <br /> <br /> BID SCHEDULE B, WATERMAIN: <br /> <br /> BID SCHEDULE C, RESTORATION: <br /> <br /> CHANGE ORDER #1 <br /> <br />USED TO DATE: <br /> <br />LESS 5% RETAINAGE; <br /> <br />LESS PAY ESTIMATE #1: <br /> <br />PE2- 2 <br /> <br /> $7,140.00 <br /> <br />$37,647.00 <br />$77,740.00 <br />$26,166.50 <br />$7~ 140.00 <br /> <br />TOTAL: $148,693.50 <br /> <br /> <br />