Laserfiche WebLink
This extended term also locks the consultant into a fee structure throughout the life of the contract, but gives them <br />some assurance that they will be able to revise the fee terms in the future (if they desire) as the economy begins to <br />recover. <br />Funding Source: <br />Preparation and review of the RFP will be handled with staff time. Ultimate funding for the consultant dollar <br />expenditures, if approved, would be from the budgeted general fund or the specified project budget. <br />Staff Recommendation: <br />Staff recommends authorization to distribute an RFP for engineering services in an effort to build a specialized <br />consultant pool to utilize, as necessary, for overflow work. <br />Committee Action: <br />Motion that the City Council authorize staff to distribute an RFP for engineering services in an effort to build a <br />specialized consultant pool to utilize, as necessary, for overflow work. <br />purchasing policy <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 02/09/2011 12:38 PM <br />Tim Himmer (Originator) Tim Himmer 02/09/2011 01:19 PM <br />Brian Olson Brian Olson 02/09/2011 04:31 PM <br />Kurt Ulrich Jo Thieling 02/10/2011 10:16 AM <br />Diana Lund Diana Lund 02/10/2011 10:34 AM <br />Form Started By: Tim Himmer Started On: 02/07/2011 04:32 PM <br />Final Approval Date: 02/10/2011 <br />