Laserfiche WebLink
Review Letter: City. Wide Door Company <br />July 28, 2000 <br />Page 3 of 3 <br /> <br />Loading Doclcs: City Code requires that one loading berth of not less than 50 feet be provided <br />for every, business with a floor area of more 'than 10,000 square feet. City Wide Door Company <br />has provided one (1) loading dock as required. <br /> <br />Drainage, Grading and Erosion Control: Catch basins have been proposed to be installed <br />along the north and east sides of the new warehouse addition. These catch basins are proposed to <br />be discharged into a detention pond located on the adjoining property to the east. This pond is <br />located on a drainage easement that is dedicated to the public. However, it is recommended that <br />the capacity of this pond to handle the additional discharge be reviewed. The City Attorney <br />should also advise on the appropr/ateness of the use of th/s sedimentation pond as a discharge <br />point. <br /> <br />Lighting Plan: The submittal does not show ex/sting or proposed exterior lighting locations. <br />The site plan should be modified accordingly if there is existing and proposed e~erior lighting <br />on the site. <br /> <br />The Ramsey PIanmng Commission will be meeting to review the proposed site plan on Tuesday, <br />August 1, 2000 at 7:00pm immediately ~bllowing the Board of Adjustment meeting. It is <br />suggested that you or your representative be present at this meeting to answer any questions that <br />may arise. <br /> <br />Enclosed for your information is a copy of the case cover sheet. If you have any questions, <br />please don't hesitate to cai1 us at (612) 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />City Engineer <br /> <br />-229- <br /> <br /> <br />