Laserfiche WebLink
UNIT LEGEND: LS =Lump Sum, SF= Square Feet, SY= Square Yard, EA =Each, <br />LF= Lineal Foot, CY =Cubic Yards. AC =Acre <br />Ramsey Bike Plan, TH 47 /St. Francis Blvd NW Segment- Preliminary Engineer's Estimate <br />Notes <br />No. <br />Section 1 - Mobilization and Surveying <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />Provide all necessary construction surveying and staking to <br />meet layout and grading requirements for all facets of work <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />2 <br />Mobilization (10 %) <br />1 <br />LS <br />$33,000.00 <br />$33,000.00 <br />3 <br />Silt Fence Type Machine Sliced <br />6,000 <br />LF <br />$0.70 <br />$4,200.00 <br />4 <br />Filter Log Type Straw Bioroll <br />800 <br />LF <br />$2.00 <br />$1,600.00 <br />5 <br />Erosion Control Blankets Category 3 <br />2,400 <br />SY <br />$1.25 <br />$3,000.00 <br />6 <br />Traffic Control <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />Section 1 - Mobilization and Surveying Total: <br />$46,300.00 <br />Notes <br />No. <br />Section 2 - Removals <br />Estimated <br />Bid Qty. <br />Unit <br />Unit Bid <br />(in Dollars) <br />Total Bid <br />(In Dollars) <br />1 <br />Clearing <br />0.5 <br />AC <br />$2,500.00 <br />$1,250.00 <br />2 <br />Grubbing <br />0.5 <br />AC <br />$2,000.00 <br />$1,000.00 <br />Section 2 - Removals Total: <br />$2,250.00 <br />Notes <br />No. <br />Section 3 - Earthwork <br />Estimated <br />Qty. <br />t <br />Unit <br />Uni t Price <br />On Dollars) <br />Total <br />(In Dollars) <br />3 <br />1 <br />Wetland Mitigation <br />9,600 <br />SF <br />$2.00 <br />$19,200.00 <br />2 <br />Common Excavation <br />3,500 <br />CY <br />$10.00 <br />$35,000.00 <br />3 <br />Select Granular Borrow <br />550 <br />CY <br />$15.00 <br />$8,250.00 <br />4 <br />Topsoil Borrow <br />1,600 <br />CY <br />$15.00 <br />$24,000.00 <br />Section 3 - Earthwork Total: <br />$86,450.00 <br />No. <br />Section 4 - Retaining Walls <br />Estimated <br />Qty. <br />Uni[ <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />Modular Block Retaining Walls <br />1,500 <br />SF <br />$30.00 <br />$45,000.00 <br />Section 4 - Retaining Walls Total: <br />$45,000.00 <br />Notes <br />No. <br />Section 5 - Utilities <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />4 <br />1 <br />15" CS Pipe Sewer <br />80 <br />LF <br />$35.00 <br />$2,800.00 <br />2 <br />15" CS Pipe Apron <br />8 <br />EA <br />$400.00 <br />$3,200.00 <br />Section 5 - Utilities Total: <br />$6,000.00 <br />Notes <br />No. <br />Section 6 - Bituminous & Concrete Pavement <br />Estimated <br />Qty. <br />Unit <br />Uni[ Price <br />On Dollars) <br />Total <br />(In Dollars) <br />5 <br />1 <br />Furnish and install 2" thick bituminous trail and 4" aggregate <br />base <br />8,900 <br />SY <br />$18.00 <br />$160,200.00 <br />2 <br />Furnish and install pedestrian ramps and truncated domes, <br />complete <br />6 <br />EA <br />$1,000.00 <br />$6,000.00 <br />Section 6 - Bituminous & Concrete Pavement Total: <br />$166,200.00 <br />Notes <br />No. <br />Section 7 - Signage & Striping <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />4" Broken Line Yellow Paint <br />2,000 <br />LF <br />$0.60 <br />$1,200.00 <br />2 <br />Furnish & Install Sign Panels Type C <br />144 <br />SF <br />$50.00 <br />$7,200.00 <br />Section 8 - Striping Total: <br />$8,400.00 <br />Notes <br />No. <br />Section 8 - Turf Establishment <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />6 <br />1 <br />Turf Establishment - Seeding <br />2 <br />AC <br />$2,000.00 <br />$4,000.00 <br />Section 9 - Turf Establishment Total: <br />$4,000.00 <br />Subtotal <br />$364,600.00 <br />15% Contingency <br />$54,690.00 <br />Total Construction Estimate <br />$419,290.00 <br />Notes <br />No. <br />Alternate 1- Boardwalk <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />On Dollars) <br />Total <br />(In Dollars) <br />7 <br />1 <br />Boardwalk (250 Ift 0 14 feet wide) <br />1 <br />LS <br />$140,000.00 <br />$140,000.00 <br />Alternate 1 - Boardwalk Total: <br />$140,000.00 <br />Total Construction Estimate Including Boardwalk <br />$580,290.00 <br />Ramsey Biking and Walking Plan SRF Consulting Group, Inc. <br />Draft 02/10/11 <br />NOTES: <br />1. This estimate is for planning purposes only and is approximate. <br />2. Estimated trail length: 8,000 Ift. <br />3. Wetland mitigation rate used is $2.00 per square foot with a 2:1 mitigation ratio. <br />4. Two roadway crossings, seven driveway crossings. <br />5. Estimate assumes 2 inches bituminous over 4 inches of Class V base material. <br />6. Five feet each side of trail assumed for turf establishment. <br />