Laserfiche WebLink
UNIT LEGEND: LS =Lump Sum, SF= Square Feet, SY= Square Yard, EA =Each, <br />LF= Lineal Foot, CY =Cubic Yards. AC =Acre <br />Ramsey Bike Plan, CR 83 /Armstrong Blvd Segment Phase 1- Preliminary Engineer's Estimate <br />Notes <br />No. <br />Section 1 - Mobilization and Surveying <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />Provide all necessary construction surveying and staking to <br />meet layout and grading requirements for all facets of work <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />2 <br />Mobilization (10 %) <br />1 <br />LS <br />$22,000.00 <br />$22,000.00 <br />3 <br />Silt Fence Type Machine Sliced <br />3,500 <br />LF <br />$0.70 <br />$2,450.00 <br />4 <br />Filter Log Type Straw Bioroll <br />2,000 <br />LF <br />$2.00 <br />$4,000.00 <br />5 <br />Erosion Control Blankets Category 3 <br />1,000 <br />SY <br />$1.25 <br />$1,250.00 <br />6 <br />Traffic Control <br />1 <br />LS <br />$2,000.00 <br />$2,000.00 <br />Section 1 - Mobilization and Surveying Total: <br />$36,700.00 <br />Notes <br />No. <br />Section 2 - Removals <br />Estimated <br />Bid Qty <br />Unit <br />Unit Bid <br />(in Dollars) <br />Total Bid <br />(In Dollars) <br />1 <br />Clearing <br />0.5 <br />AC <br />$2,500.00 <br />$1,250.00 <br />2 <br />Grubbing <br />0.5 <br />AC <br />$2,000.00 <br />$1,000.00 <br />Section 2 - Removals Total: <br />$2,250.00 <br />Notes <br />No. <br />Section 3 - Earthwork <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />Common Excavation <br />2,700 <br />CY <br />$10.00 <br />$27,000.00 <br />2 <br />Topsoil Borrow <br />1,200 <br />CY <br />$15.00 <br />$18,000.00 <br />Section 3 - Earthwork Total: <br />$45,000.00 <br />Notes <br />No. <br />Section 4 - Utilities <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />3 <br />1 <br />15" CS Pipe Sewer <br />60 <br />LF <br />$35.00 <br />$2,100.00 <br />2 <br />15" CS Pipe Apron <br />6 <br />EA <br />$400.00 <br />$2,400.00 <br />Section 4 - Utilities Total: <br />$4,500.00 <br />Notes <br />No. <br />Section 5 - Bituminous & Concrete Pavement <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />4 <br />1 <br />Furnish and install 2" thick bituminous trail and 4" aggregate <br />base <br />6,800 <br />SY <br />$18.00 <br />$122,400.00 <br />2 <br />Furnish and install pedestrian ramps and truncated domes, <br />complete <br />10 <br />EA <br />$1,000.00 <br />$10,000.00 <br />Section 5 - Bituminous & Concrete Pavement Total: <br />$132,400.00 <br />Notes <br />No. <br />Section 6 - Signage & Striping <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />1 <br />4" Broken Line Yellow Paint <br />1,500 <br />LF <br />$0.60 <br />$900.00 <br />2 <br />Furnish & Install Sign Panels Type C <br />360 <br />SF <br />$50.00 <br />$18,000.00 <br />Section 6 - Striping Total: <br />$18,900.00 <br />Notes <br />No. <br />Section 7 - Turf Establishment <br />Estimated <br />Qty. <br />Unit <br />Unit Price <br />(in Dollars) <br />Total <br />(In Dollars) <br />5 <br />1 <br />Turf Establishment - Seeding <br />1.5 <br />AC <br />$2,000.00 <br />$3,000.00 <br />Section 7 - Turf Establishment Total: <br />$3,000.00 <br />Subtotal <br />$242,750.00 <br />15% Contingency <br />$36,412.50 <br />Total Construction Estimate <br />$279,162.50 <br />Ramsey Biking and Walking Plan <br />NOTES: <br />1. This estimate is for planning purposes only and is approximate. <br />2. Estimated trail length: 6,100 Ift., Apline Dr NW to 161st Ave NW <br />3. Five roadway crossings, four driveway crossings. <br />4. Estimate assumes 2 inches bituminous over 4 inches of Class V base material. <br />5. Five feet each side of trail assumed for turf establishment. <br />SRF Consulting Group, Inc. <br />Draft 02/18/11 <br />