My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/29/2011
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2011
>
Agenda - Council Work Session - 03/29/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:59:54 PM
Creation date
3/24/2011 11:13:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/29/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Property Owner: <br />Anoka County Highway <br />Environmental <br />Braun Intertec <br />Department <br />Consultant: <br />Corporation <br />Owner <br />Andrew Witter <br />Project Manager: <br />George E. Beatty <br />Representative: <br />(Assistant County Engineer) <br />Phone: <br />763.862.4249 <br />Phone: <br />651.487.7037 <br />Fax: <br />763.862.4201 <br />Fax: <br />651.487.1812 <br />Future Property <br />MPCA Emergency <br />City of Ramsey <br />651.649.5451 <br />Owner: <br />(State Duty Officer) <br />Owner <br />Brian Olson <br />Representative: <br />(Director of Public Works) <br />Phone: <br />763.438.9825 <br />Fax: <br />Local Emergency <br />911 <br />Response Action Plan and Construction Contingency Plan <br />Former Oasis Market <br />14550 Armstrong Blvd NW <br />Ramsey, Minnesota <br />1.0 Introduction <br />Anoka County Highway Department (Anoka County) is preparing to demolish the existing Oasis Market <br />and strip mall buildings located at 14550 Armstrong Blvd NW, Ramsey, Anoka County, Minnesota (Site) <br />in preparation for roadway improvements in the area. A Site location map is included as Figure 1 and a <br />Site plan as Figure 2. <br />This Response Action Plan and Construction Contingency Plan (RAP /CCP) summarizes previous work <br />conducted at the Site. It also provides a description of the methods that will be used to evaluate and <br />manage petroleum- impacted soils that may be encountered during demolition and roadway <br />construction activities. <br />2.0 Responsibilities <br />The following are the key personnel involved in the project: <br />
The URL can be used to link to this page
Your browser does not support the video tag.