My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/20/2001 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2001
>
Agenda - Council - 11/20/2001 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:30:01 PM
Creation date
9/8/2003 3:30:56 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
11/20/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. <br /> <br />1'0. <br /> <br />tl. <br /> <br />12. <br /> <br /> Ail work sites shall be properly safeguarded to prevent the general public from depositing <br />· garbage or other refuse on the work site. <br /> <br />Prior to the removal of trees, the City Engineer shall be notified at least 72 hours in <br />advance of the removal so that the number of trees required for reforestation can be <br />determined. <br /> <br />Grading operations shall be conducted in such a manner to minimize interference with the <br />surface water drainage outside the boundaries of the operation. <br /> <br />Fencing may be ordered by the City Council or City Engineer anytime the permit is in <br />force and shall be installed within 24 hours of written notice. <br /> <br />All haul roads to and from the'Subject Property shaIt be maintained in order to minimize <br />dust and in a condition satisfactory to the City Engineer. This work shall fnclude <br />application of water, bituminous material, or calcium chloride to the road surface as may. <br />be necessary to alleviate dust nuisance and eliminate traffic hazards. This work shall also <br />include daily inspections of County Road #64 and the removal of spillage of any <br />materials from the operation. When hauling operations are completed, the permit holder <br />shall either restore that haul road to a condition at least equal to that which existed at the <br />time the hauling operations were started, or compensate the local road authority in an <br />amount satisfactory to that road authority and concurred in by the City Engineer for the <br />restoration of that haul road. The City Engineer will then accept such restoration or <br />concur in such financial settlement for the restoration of the haul road in writing and such <br />acceptance will relieve the permit holder of any additional obligation in connection with <br />the restoration of ~he haul roads. If the permit holder fails or refuses to perform haul road- <br />restoration or to make satisfactory financial settlement for such restoration, the City will <br />cause the restoration work to be done and require reimbursement from the financial <br />guarantee required herein. <br /> <br />The maximum slope other than the working face shall be sloped on all sides no steeper <br />than a rate of 2 foot horizontal to I foot vertical. In no case shall the slope of the working <br />face be left unattended with a slope greater than 2 feet horizontal to 1 foot vertical. When <br />mining operations are anticipated to be discontinued for an interval greater than two <br />working days, the slopes shall be flattened to a grade no steeper than 4 feet horizontal to 1 <br />foot vertical. Final slopes shall be' consistent with the plan submitted and shall be no <br />steeper than 12 feet horizontal to 1 foot vertical. <br /> <br />Ingress and egress shall be along the desig-nated haul roads identified on the Subject <br />Property to the access location specified on County Road #64 Public haul roads beyond. <br />the Subject Property shall be limited to State and County roadways. <br /> <br />RESOLUTION #97-0%286 <br /> Page 3 of 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.