My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/06/2000
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2000
>
Agenda - Planning Commission - 03/06/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:21:53 AM
Creation date
9/9/2003 8:26:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/06/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />March 2, 2000 <br />Valley View Sketch Plan <br /> <br />Soils: The soils on the property consist of Heyden and Dalbo soil groups which are class one (1) <br />soils. <br /> <br />Drainage and Easements: Wetlands will need to be delineated with drainage and utility easements <br />at the tin~::, of preliminary plat. <br /> <br />Park Dedication: The plat will be forwarded to the Park Commission for their review at their <br />regular meeting in March. <br /> <br />Tree Preservation: The developer must include a tree preservation plan when a preliminary plat is <br />submitted. This plan should identify existing tree growth that will be preserved during construction <br />and the new planting of one 2 inch diameter tree, of an approved species in the front yard of each <br />new lot created. No grading will be allowed until this requirement is fulfilled. <br /> <br />Trial Development Fees: The City has established a trial development fee of $300 per dwelling <br />unit that is collected prior to the release of the f'mal plat for recording. Trail fees will need to be <br />collected for three (3) lots. <br /> <br />Stormwater Management Fee: The City has established a stormwater management fee of $366 <br />per dwelling unit that is also collected prior to the release of the f'mal plat for recording. <br />Stormwater management fees will need to be collected for three (3) lots. <br /> <br />The Planning Commission will meet immediately following the 7:00pm Board of Adjustment <br />meeting on Monday, March 6, 2000 to consider your request for sketch plan approval of Valley <br />View. It is important that you, or your representative, be present at the meeting to answer any <br />questions that may arise. <br /> <br />Thank you for your cooperation. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Community Development Assistant <br /> <br />City Engineer <br /> <br />Reviewed by: <br />Sylvia Frotik, Community Development Director <br />Anita Rasmussen, City Planner <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.