My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2000
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2000
>
Agenda - Public Works Committee - 01/18/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:27:10 PM
Creation date
9/9/2003 9:05:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PW CASE <br /> <br />UPDATE ON 164TM LANE STORM SEWER <br />(IMPROVEMENT PROJECT #99-68) <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />A storm sewer is needed to alleviate a drainage problem that exists in the area of 164th Lane and <br />C.S.A.H. #5. In 1999, this project was added to our five-year CIP, 2000-2004. Attached is the <br />project sheet, which anticipates placing a storm sewer within the right-of-way of 164th Lane and <br />discharging to the protected wetland near the western terminus of the roadway. <br /> <br />Staff was asked to investigate the possibility of an alternative route near the eastern end of 164th <br />Lane. Attached is a sketch illustrating the alternative route, which would involve participation <br />from two properties. Staff had some difficulty in contacting these property owners but has now <br />met and spoken to both of them. While the owners of the property fronting on 164th Lane were <br />receptive to the storm sewer concept, the property owner fronting on C.S.A.H. #5 was strongly <br />opposed to the idea. <br /> <br />Recommendation: <br /> <br />It is staff's recommendation that we begin design of the project utilizing the CIP route and begin <br />discussion with the property owners of PIN-0014, -0016 and -0018 to obtain an easement from <br />164th Lane to the wetland. <br /> <br />Committee Action: <br /> <br />Provide direction on project implementation. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Director of Public Works <br /> <br />PW: 01/18/00 <br /> <br />$7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.