My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/21/2000
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2000
>
Agenda - Public Works Committee - 03/21/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:27:47 PM
Creation date
9/9/2003 9:06:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/21/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Introduction <br /> <br />The City of Ramsey, Minnesota is seeking proposals from qualified engineering firms to provide <br />engineering project management services for capital improvements pertaining to the City's water <br />system improvements. <br /> <br />The water system improvements are as follows: 1. Construction of a new water supply Well, <br />with submersible pump and controls; 2. Pumphouse facility to house controls for two wells <br />(possibly with expansion capabilities for iron and manganese removal); 3. Construction of a <br />1,500,000 gallon elevated water storage tank; and 4. Painting of the existing 500,000 gallon <br />elevated water storage tank. <br /> <br />II. Scope of Services <br /> <br />The engineering project management scope of services includes the following items: <br /> <br />Provide construction observation to ensure the new water supply well is <br />constructed according to the State of Minnesota Department of Health <br />requirements. -:' <br /> <br />Provide engineering documents in order to secure the well supply pump and. <br />associated controls. <br /> <br />Provide engineering documents in order to secure a qualified contractor to <br />construct a well pump building for the new water supply as well as possible future <br />well expansions. <br /> <br />Coordinate obtaining the necessary services from a qualified firm that would <br />perform the necessary construction observation to ensure the well pump building <br />is constructed in accordance with specified City and State of Minnesota building <br />standards. <br /> <br />o <br /> <br />Provide engineering documents in order to secure a qualified supervisory control <br />and data acquisition system (SCADA) integrator for the water supply and water <br />storage facilities. <br /> <br />4 <br /> <br />Coordinate and assist the City staff in processing and obtaining all necessary <br />permits and approvals from agencies for the water system improvements. <br /> <br />Coordinate and assist the City Staff in reviewing payment requests from the <br />various contractors and firms associated with performing the water system <br />improvements. <br /> <br />Coordinate and assist the City staff to ensure all aspects of the water system <br />improvements are completed satisfactorily and in a timely manner. <br /> <br />GAUSERStPMILLERIREQUEST FOR PROPOSAL. doc03/13/O0 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.