Laserfiche WebLink
Tradesmen Properties, LLC <br />Development Permit <br />Page 2 of 4 <br /> <br />10. <br /> <br />11. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Chief. <br /> <br />LIGHTING. Any lighting installed on the site is subject to prior approval of the City <br />Engineer and shall be designed so as to deflect light away from the public streets. Bulbs <br />emitting in excess of 3,000 lumens (150 watts) shall be so directed that the bulb is not <br />visible from off of the property where such light source is located.. <br /> <br />BUILDING FACADE. The Permit-tee agrees to construct the Structure of brick and <br />stucco in accordance with the Building Elevations (Sheet A4) prepared by Lampert <br />Architects, dated January 29, 1999, revision dated ~ 1999. <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for the Site will be issued until the Permittee has: <br />a) signed and returned this Development Permit; b) provided the required financial <br />guarantee in accordance with Paragraph 11 of this Permit. No Certificate of Occupancy <br />for the structure will be issued until the Required Improvements, or a financial surety for <br />-the Required Improvements, are accepted by the City. <br /> <br />IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements <br />shall be completed before November 1, 1999. <br /> <br />ESCROW FOR REQUIRED IMPROVEMENTS. In order to insure the installation of <br />the Required Improvements in accordance with City specifications and in a timely <br />manner, the Permittee shall be required to deposit with the City a cash escrow or letter of <br />credit, approved as to form by the City, in the amount of Forty Tow Thousand Six <br />Hundred Dollars and no cents ($42,600.00), which is 150% of the City's estimated cost of <br />the Improvements. Prior to the issuance of the building permit, all financial guarantees <br />must be provided as required herein. <br /> <br />Upon completion of the construction of the Required Improvements, the financial <br />guarantee shall be returned to the Permittee and the Permittee shall be required to provide <br />the landscaping maintenance guarantee described in Item #12 of this Development <br />Permit. The determination of completion of the construction of the Required <br />Improvements shall be made by the City Engineer or his/her designee. In the event the <br />Permittee fails to construct and install the Required Improvements as required herein, the <br />City Council may order the completion of the Required Improvements with City day <br />labor and/or by letting contracts for said completion and draw 'upon the escrow for <br />payment. Only the City Council shall have the authority to direct completion of the <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> i <br /> I <br /> I <br /> I <br /> <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />