My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/1999
Ramsey
>
Public
>
Agendas
>
Council
>
1999
>
Agenda - Council - 03/09/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 3:39:45 PM
Creation date
9/11/2003 2:32:30 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tri-Cities Community Center <br />Feasibility Analysis <br />January 4, 1999 - Page 3 <br /> <br />Project deliverables will include fifteen (15) copies of a summary report including <br />market analysis, preliminary program, preliminary estimate of capital costs, operating <br />expenses and revenues, site recommendations, market viability and overall project <br />recommendation. <br /> <br />As we stated in our me. eting with you on October 22, we are available to begin work on <br />this study approximately two weeks from the acceptance of this proposal and notification <br />to proceed. Estimated time frame for completion is approximately 90 days from date of <br />commencement. <br /> <br />In our-meeting with you we also discussed the need and timing for citizen participation <br />in this process. Agaia we see this as one of the necessary next steps once the preliminary <br />feasibility study has been completed. At that time we would recommend implementation <br />of a citizen participation plan, which may include a telephone survey to determine <br />desired needs, and a series of public focus group project workshops. Additional next <br />steps could include a more detailed analysis of an operational model, conceptual facility <br />layout and design, and a detailed project capital cost estimate. Costs for the next step <br />could range over a broad spectrum depending on the scope of services selected. It may <br />also be dependent on the level of participation by each of the three cities based on the <br />information provided in this initial feasibility analysis. <br /> <br />COMPENSATION <br /> <br />Compensation for Phase I Feasibility Analysis shall be a lump sum of Sixteen Thousand <br />Dolla'rs ($16,000). Reimbursable expenses are in addition to fees and include two (2) <br />trips for Ken Ballard to the twin cities area, the cost of reproduction, long distance <br />telephone calls, and necessary courier services. Ken Ballard's travel expenses will be <br />billed at cost; all other reimbursable expenses will be billed at One and One-Tenth (1.1) <br />times cost to BWB1L Total reimbursable expenses are estimated at Two Thousand Four <br />Hundred Dollars ($2,400). <br /> <br />This agreement may be terminated by either party upon seven (7) days written notice. In <br />the event of termination, BWBR shall be compensated for all services performed prior to <br />the termination date together with reimbursable expenses. <br /> <br />Because of factors beyond the control of BWBR and the Owner, actual bids and <br />nego/iated construction costs may vary from such estimates of construction cost which <br />we may prepare as a part of this study. Accordingly, BWBR does not warrant such <br />estimates. <br /> <br />If this proposal is acceptable, please sign and date on the space provided below and <br />return one copy to us, retaining the other copy for your file. <br /> <br />26 February, 1999 <br /> <br />BWBR Architects, Inc. <br /> <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />i <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />10-29tricities.dI <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.