Laserfiche WebLink
Case #3: Review Storm Drainage Projects Added to C.I.P. <br /> <br />Although the Public Works Committee was unable to get to this case due to time constraints, one <br />of the CIP projects which had been added as a new storm water project was the installation of a <br />sewer along 164th Lane. This project would remedy an existing drainage problem that has been <br />particularly bothersome in the Spring. Although this case might be discussed at the regular <br />September meeting, it is worthy to note that immediate action authorizing the project would be <br />necessary for the project to be constructed, including restoration, this Fall to be in place for next <br />Spring. <br /> <br />Council Action: <br /> <br />Based on discussion. <br /> <br />Reviewed by: <br />Director of Public Works <br /> <br />CC: 08/24/99 <br /> <br />I <br />I <br />I <br />I <br /> <br /> <br />