Laserfiche WebLink
I <br />I <br /> <br /> I <br /> <br />I <br />I <br /> <br /> 5. Operation and Maintenance <br /> <br /> We recommend that the City begin planning for installation of on-site power generators <br />for the east and west welI field, fi.the water treatment facility is planned for construction within <br />the next 3-4 years, on-site generators could be delayed until that time. On-site generators would <br />not be needed for the east well field at that time. <br /> <br /> We also recommend that the City begin increasing the staffing allocation to the water <br />system. As noted, only approximately 0.65 FTE is allocated to the water system. This should be <br />brought up to a minimum of 3.0, with an optimum range of 4 to 5 FTE allocated to water system <br />work. <br /> <br /> In addition, we recommend that the City begin a program for encouraging water <br />conservation practices throughout the system. <br /> <br />C. IMPLEMENTATION SCHEDULE <br /> Table 8. l summarizes the proposed implementation schedule and estimated cost for each <br />project. <br /> <br /> Table 8.1 <br /> Implementation Schedule <br /> <br /> Estimated <br />Year Item Cost <br />1999 Well No. 5 3;440:000 <br />2000 1.5 MG Tower .. $I,820,000 <br />2000 Dist. System. Improvements 1 through 3 $380,000 <br />2001 Di~ System Improvements 4 and 5 $209,000 <br />2002 Existing Water Tower Rcpair and Painting $180,000 <br />2002 Water Treatment Facility $10,000,000 <br />2002 Const~ct Wells No. 6 and 7 with Water Treatment Facility $960:000 <br />2002 Dist_ System Improvement 6 $82..000 <br />2003 Dist. S}'stem Improvement 7 $81:500 <br />2003 Well No. 8 $480,000 <br />2004 Dist. S~.'slem Improvement 8 $157,1300 <br />2005 1.0 MG Water Tower $1.495.000 <br />2005 DisL System Improvements 9 and 10 ~502,000 <br />2010 WelI No. 9 ~660,000 <br />2015 Well No. 10 $845,000 <br /> <br />City of Ramsey, Minnesota - EA 99. 0021 <br />PFater System Study <br /> <br /> Page 8-2 <br />Prepared by Bo/ton dr Men& Inc. <br /> <br /> <br />