Laserfiche WebLink
We have discussed these revisions with a contractor and have been quoted a price to correct as time and material <br />costs, not to exceed $2,000. This work would be performed utilizing hand labor to the extent possible, but small <br />equipment will be necessary to haul the rip -rap material to the outfall location. It is their intent to protect and limit <br />damage to the new turf that is being established, but any damage done will also be restored. <br />Funding Source: <br />If authorized, these improvements would be funded through the Stormwater Utility Enterprise Fund. <br />Staff Recommendation: <br />Staff recommends that the City Council authorize the proposed outfall revisions on a time and material basis, not to <br />exceed $2,000. <br />Committee Action: <br />Motion to authorize the proposed Ute Street storm sewer outfall revisions on a time and material basis, not to <br />exceed $2,000. <br />Location Map <br />Photos <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 05/04/2011 12:27 PM <br />Kurt Ulrich Kurt Ulrich 05/04/2011 02:19 PM <br />Form Started By: Tim Himmer Started On: 05/03/2011 <br />Final Approval Date: 05/04/2011 <br />