Laserfiche WebLink
o <br /> <br />o <br /> <br />o <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />STORMWATER MANAGEMENT FEE. The CITY has enacted a Stormwater <br />Management Fee in the amount of Three Thousand Six Hundred Fifty Eight Dollars <br />($3,658.00) per commercial acre. The amount of Stormwater Management Fee due on <br />the Site is Five Thousand Eight Hundred Fifty Dollars ($5,850.00) (1.6 acres x <br />$3658/acre). A cash payment will be required prior to the CITY releasing the Building <br />Permit and it will be utilized for drainage improvements within the Alpaca Estates <br />commercial area_. <br /> <br />FIRE LANES. Fire lanes shall be maintained on the Site. The exact location of these <br />items on the Site shall be as directed by the City's Fire Chief. <br /> <br />LIGHTING. Any lighting installed on the structure or in the parking lot is subject to the <br />prior approval of the City Engineer and shall be designed so as to deflect light away from <br />Riverdale Drive N.W. and all adjacent parcels. Bulbs emitting in excess of 3,000 lumens <br />(150 watts) shall be so directed that the bulb is not visible from off of the property where <br />such light source is located <br /> <br />BUILDING FACADE. The Permittee agrees to face the Structure with maintenance- <br />free siding and decorative brick or stone shall be added to the lower four feet of the front <br />facing wall in accordance with the Exterior Elevations prepared by <br />dated. . , 1999, revision dated <br /> <br />REQUIREMENTS FOR BUILDING PERMIT AND CERTIFICATE OF <br />OCCUPANCY. No building permit for the Site will be issued until the permittee has: a) <br />signed and returned this Development Permit; b) provided the required cash payment for <br />stormwater management in accordance with Item #6 of this Permit; and c) provided the <br />required financial guarantee in accordance with Item #12 of this Permit. No Certificate of <br />Occupancy for the structure will be issued until: a) the Required Improvements a~b <br />accepted by the City; and b) the landscaping maintenance guarantee has been provided <br />in accordance with Item #l 3 of this Development Permit. <br /> <br />IMPROVEMENT CONSTRUCTION SCHEDULE. The Required Improvements <br />shall be completed before September 1, 2000. <br /> <br />ESCROW FOR REQUIRED I1VEPROVEMENTS. In order to ensure the installation <br />of the Required Improvements in accordance with City specifications and in a timely <br />manner, the Permittee shall be required to deposit with the City a cash escrow or letter of <br />credit, approved as to form by the City, in the amount of Nineteen Thousand Two <br />Hundred Dollars and no cents ($19,200.00), which is 150% of the City's estimated cost of <br />the Improvements. Prior to the issuance of the building permit, all financial guarantees <br />must be provided as required herein. <br /> <br />Upon completion of the construction of the Required Improvements, the financial <br />guarantee shall be returned to the Permittee and the Permittee shall be required to provide <br />the landscaping maintenance guarantee described in Item #13 of this Development <br /> <br /> <br />