Laserfiche WebLink
b) Request proposal for elevated tank design and construction inspection from KLM <br /> Engineering and AEC Engineering; and <br />c) Redefine the scope of remaining engineering work and project coordination, and request <br /> proposals from the five firms submitting previous proposals. <br /> <br />Council Action: <br /> <br />Motion to direct staff to' <br /> <br />a) Retain Roger Renner to drill a test well and evaluate the site for Well No. 5 at a cost not to <br /> exceed $15,640; and <br />b) Request proposal for elevated tank design and construction inspection from KLM <br /> Engineering and AEC Engineering; and <br />c) Redefine the scope of remaining engineering work and project coordination, and request <br /> proposals from the five firms submitting previous proposals. <br /> <br />Reviewed by: <br /> <br />City Administrator <br />Director of Public Works <br /> <br />CC: 11/23/99 <br /> <br />\\RA_FS l\VOLlXusers\City Shared FilckCOUNCILC\CITYCOUN\Construction Manager for Water Work.doc <br /> <br /> <br />