My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/16/1999
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
1998 - 1999
>
1999
>
Agenda - Public Works Committee - 02/16/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:10:08 PM
Creation date
9/15/2003 8:27:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I~. COSTS <br /> <br /> A. The contract costs of the work, or if the work is not contracted the cost of all labor, <br />materials, normal engineefing costs, and equipment rental required to complete the work, shall <br />constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" are <br />good faith projections of the costs which will be incurred for this project. Actual costs may vary, <br />and those will be the costs for which the City will be responsible. <br /> <br /> B. The estimated cost of the total project is Seven Hundred Eighteen Thousand Two <br />Hundred Sixty-Two and 10/1002 Dollars ($718,262.10). The County will not pay for the following, <br />which shall be the sole responsibility of the City: <br /> <br /> 1. The City will pay for 100% of the cost of new sidewalks installed on the <br />project. The estimated cost to the City is zero (0). <br /> <br /> 2. The City will pay 100% of the hydrant relocation and gate box adjustment, <br />water, and sewer construction. The estimated cost to the City for these items is $1,270.02. <br /> <br /> 3. The City will pay 100% of the cost of bituminous path. The City's estimated <br />cost for bituminous path pavement is $61,921.00. <br /> <br />acquisition. <br /> <br />The City shall pay for all fight-of-way as well as all costs of right-of-way <br /> <br /> 5. The City will pay 100% of the wetland mitigation. The cost of wetland <br />mitigation is estimated at $8,672.87. <br /> <br /> 6. The total estimated cost to the City for construction of the project is <br />$71,863.89. The City's participation in engineering will be at the rate of 8% of its designated share. <br />The estimated cost to the City for engineering is $5,749.11. <br /> <br /> C. The total estimated construction cost to the City for the project is Seventy-Seven <br />Thousand Six Hundred Thirteen and 00/100s Dollars ($77,613.00). <br /> <br />-3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.