Laserfiche WebLink
W$B <br />&& Associates. <br />� <br />RAMSEY - Armstrong and <br />Project Name: Bunker Lake Boulevard Int and Contract No.: <br />Extensions <br />Client: City of Ramsey <br />Bid Opening: 5/16/2011 1:00 PM <br />Project No.: 01973-00 <br />Owner: Minneapolis <br />WSB <br />Project Bid Abstract <br />Denotes correction <br />5/18/2011 <br />Project: 01973-00 - RAMSEY - Armstrong and Bunker Lake Boulevard Int and Extensions <br />Engineers Estimate <br />Douglas -Kerr Underground, LLC <br />R. L. Larson Excavating, Inc. <br />Redstone Construction <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Unit Price Total Price <br />Base Bid <br />1 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />1 <br />$110,000.00 <br />$110,000.00 <br />$116,195.00 <br />$116,195.00 <br />$40,000.00 <br />$40,000.00 <br />$138,500.00 <br />$138,500.00 <br />2 <br />2031.501 <br />FIELD OFFICE TYPE D <br />EACH <br />1 <br />$15,000.00 <br />$15,000.00 <br />$6,700.00 <br />$6,700.00 <br />$5,000.00 <br />$5,000.00 <br />$8,000.00 <br />$8,000.00 <br />3 <br />2101.501 <br />CLEARING <br />ACRE <br />0.4 <br />$2,200.00 <br />$880.00 <br />$1,500.00 <br />$600.00 <br />$1,000.00 <br />$400.00 <br />$600.00 <br />$240.00 <br />4 <br />2101.502 <br />CLEARING <br />TREE <br />127 <br />$120.00 <br />$15,240.00 <br />$60.00 <br />$7,620.00 <br />$65.00 <br />$8,255.00 <br />$60.00 <br />$7,620.00 <br />5 <br />2101.506 <br />GRUBBING <br />ACRE <br />0.4 <br />$1,700.00 <br />$680.00 <br />$1,500.00 <br />$600.00 <br />$2,000.00 <br />$800.00 <br />$600.00 <br />$240.00 <br />6 <br />2101.507 <br />GRUBBING <br />TREE <br />127 <br />$80.00 <br />$10,160.00 <br />$20.00 <br />$2,540.00 <br />$20.00 <br />$2,540.00 <br />$20.00 <br />$2,540.00 <br />7 <br />2104.501 <br />REMOVE METAL CULVERT <br />LIN FT <br />532 <br />$7.00 <br />$3,724.00 <br />$5.00 <br />$2,660.00 <br />$3.00 <br />$1,596.00 <br />$3.20 <br />$1,702.40 <br />8 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />LIN FT <br />148 <br />$12.00 <br />$1,776.00 <br />$8.00 <br />$1,184.00 <br />$4.00 <br />$592.00 <br />$8.50 <br />$1,258.00 <br />9 <br />2104.501 <br />REMOVE SEWER PIPE (SANITARY) <br />LIN FT <br />6 <br />$7.00 <br />$42.00 <br />$0.01 <br />$0.06 <br />$10.00 <br />$60.00 <br />$11.00 <br />$66.00 <br />10 <br />2104.501 <br />REMOVE STEEL CASING <br />LIN FT <br />10 <br />$65.00 <br />$650.00 <br />$150.00 <br />$1,500.00 <br />$20.00 <br />$200.00 <br />$21.30 <br />$213.00 <br />11 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />20800 <br />$2.00 <br />$41,600.00 <br />$1.50 <br />$31,200.00 <br />$1.50 <br />$31,200.00 <br />$1.50 <br />$31,200.00 <br />12 <br />2104.509 <br />REMOVE CONCRETE APRON <br />EACH <br />3 <br />$250.00 <br />$750.00 <br />$125.00 <br />$375.00 <br />$50.00 <br />$150.00 <br />$105.00 <br />$315.00 <br />13 <br />2104.509 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$175.00 <br />$175.00 <br />$200.00 <br />$200.00 <br />$316.00 <br />$316.00 <br />14 <br />2104.509 <br />REMOVE SIGN TYPE C <br />EACH <br />35 <br />$25.00 <br />$875.00 <br />$35.00 <br />$1,225.00 <br />$25.00 <br />$875.00 <br />$25.00 <br />$875.00 <br />15 <br />2104.509 <br />REMOVE SIGN TYPE SPECIAL <br />EACH <br />1 <br />$120.00 <br />$120.00 <br />$25.00 <br />$25.00 <br />$30.00 <br />$30.00 <br />$25.00 <br />$25.00 <br />16 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />970 <br />$2.50 <br />$2,425.00 <br />$2.90 <br />$2,813.00 <br />$2.50 <br />$2,425.00 <br />$2.90 <br />$2,813.00 <br />17 <br />2104.521 <br />SALVAGE FENCE <br />LIN FT <br />400 <br />$8.00 <br />$3,200.00 <br />$6.00 <br />$2,400.00 <br />$4.00 <br />$1,600.00 <br />$7.00 <br />$2,800.00 <br />18 <br />2104.521 <br />SALVAGE METAL CULVERTS <br />LIN FT <br />72 <br />$7.00 <br />$504.00 <br />i5.20 <br />$374.40 <br />$5.00 <br />$360.00 <br />$3.20 <br />$230.40 <br />19 <br />2104.523 <br />SALVAGE GATE VALVE <br />EACH <br />1 <br />$150.00 <br />$150.00 <br />$187.50 <br />$187.50 <br />$150.00 <br />$150.00 <br />$158.00 <br />$158.00 <br />20 <br />2104.523 <br />SALVAGE HYDRANT <br />EACH <br />1 <br />$300.00 <br />$300.00 <br />$375.00 <br />$375.00 <br />$210.00 <br />$210.00 <br />$213.00 <br />$213.00 <br />21 <br />2104.523 <br />SALVAGE METAL APRON <br />EACH <br />2 <br />$250.00 <br />$500.00 <br />$93.75 <br />$187.50 <br />$25.00 <br />$50.00 <br />$25.00 <br />$50.00 <br />22 <br />2104.523 <br />SALVAGE SIGN TYPE SPECIAL <br />EACH <br />2 <br />$180.00 <br />$360.00 <br />$25.00 <br />$50.00 <br />$30.00 <br />$60.00 <br />$25.00 <br />$50.00 <br />23 <br />2105.525 <br />TOPSOIL BORROW (CV) <br />CU YD <br />500 <br />$12.00 <br />$6,000.00 <br />$16.15 <br />$8,075.00 <br />$16.00 <br />$8,000.00 <br />$16.15 <br />$8,075.00 <br />24 <br />2105.601 <br />DEWATERING <br />LUMP SUM <br />1 <br />$20,000.00 <br />$20,000.00 <br />$112,766.00 <br />$112,766.00 <br />$115,000.00 <br />$115,000.00 <br />$100,000.00 <br />$100,000.00 <br />Page 1 <br />