My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 03/24/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:33:55 PM
Creation date
9/16/2003 1:30:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />City of Ramsey <br />BRA File No. 43806 <br />March 16, 1998 <br /> <br />Page 2 <br /> <br />Alternate No. 4 specified the installation of a temporary control panel to be installed at Pump Facility No. <br />4. This panel would allow manual control of this well by June 30, 1998. Due to the uncertainties related to <br />weather, we recommend that the City accept this alternate which will allow the use of this well at the <br />earliest possible time. Permanent control panels which are to be installed as part of the base bid will not be <br />available for use until late Fall, 1998. <br /> <br />Total Alternate No. 4 = $3,600.00 <br /> <br />Two additional alternate equipment items were submitted by the Contractor. <br /> <br />An alternate well pump was proposed by the Contractor. They offered to provide a deduct of $2,400 to <br />substitute Gould Pumps. Since the test pumping has not been completed at this time, we recommend <br />that the project b, awarded with the Base Bid equipment. Should the results of test pumping require a <br />modification to the pump capacity, a change order could be issued at that time. <br /> <br />An alternate control supplier was proposed by the Contractor. They offered to provide a deduct of <br />$8,500 to substitute Total Control Systems ('rcs). The Base Bid control supplier, System Controls <br />Services (SCS) has been listed as the control supplier by EnComm Midwest, LLC. This control <br />supplier is currently working on the SCADA system for the City. Keeping both projects, the SCADA <br />system and this project under the same'control supplier provides the City with continuity and <br />consistency. Having two different control suppliers may lead to responsibility and warranty problems. <br />The SCADA system will still be under warranty by SCS when TCS begins to install their hardware <br />and software, and to make changes in the SCADA system programming. As a result, parts of the SCS <br />warranty may be voided after TCS makes changes to incorporate their work. <br /> <br />Total Control Systems (TCS) and System Control Services (SCS) are companies essentially equal in <br />size and capability. TCS has performed satisfactorily on other projects of ours, and we are confident <br />they can do a satisfactory job on this project. Historically, we know there will be additional <br />coordination problems on Projects which 'involve two control suppliers which will result in Bonestroo <br />& Assocs. spending extra time to resolve. <br /> <br />We have checked with Bacon's Electric, Inc., the low electrical subcontractor, and they have <br />confirmed that TCS has covered all items inclUded in the SCS quotatiom <br /> <br />We would prefer to continue to use the same systems inte~ator that has designed the initial SCADA <br />system to maintain continuity. <br /> <br />Therefore, we recommend that the project be awarded to Encomm Midwest, LLC for the Total Base <br />Bid amount of $223,422.50 plus Alternate No. 2 and Alternate No. 4for the Total Adjusted Bid amount <br />of $272,892.50. This compares with the Engineer's'Estimate of $252,020.OO for these items. <br /> <br />Base Bid <br />Alternate No. 2 <br />Alternate No. 4 <br />Total Adjusted Bid <br /> <br />$223,422.50 <br /> $45,870.00 <br /> $3,600.00 _ <br />$272,892.50 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.