<br />March 16, 1998
<br />
<br />City of Ramsey
<br />15153 Nowthen Blvd NW
<br />Ramsey, MN 55303
<br />
<br />Bonestroo, Rosene, Ander/ik and Associates, Inc. is an Affirmative Action/Equal Opportunity Empl¢ var
<br />
<br />Principals: Otto G. Bonestroo, RE. · Joseph C, Anderlik, P.E. · Marvin L. Sorvala,
<br />Richard E. Turner, R£, · Glenn R. Cook, P.E. · Robert G. Schunicht, RE. · Jerry A. Bourdon, RE. ·
<br />Robert W. Rosene, RE. and Susan M. Eberlin, C,RA., Senior Consultants
<br />
<br />Associate Principals: Howard ~. Sanford,
<br />Richard W. Foster, RE. · David O. Loskota, RE, · Robert C. Russek, A.I.A. , Mark A. Hanson, RE. ·
<br />Michael T. Rautmann, RE. · Ted K.Field, RE., Kenneth R Anderson. RE.. Mark R. Rolls, RE..
<br />Sidney R ~illiamson, RE., ES. · Robert R
<br />
<br />Offices: St. ~aul, Rochester, Willmar and St. Cloud, MN · Milwaukee,
<br />
<br />Re:
<br />
<br />Well No. 4 Pumping Facility
<br />BRA File No. 43806
<br />
<br />Honorable Mayor and City Council:
<br />
<br />Low. EnComm Midwest, LLC $223,422.50
<br />#2 Municipal Builders, Inc. $228,800.00
<br />#3 Northdale Construction Co., Inc. $240,492.71
<br />#4 W.B. Miller, Inc. $246,145.00
<br />#5 Lametti & Sons, Inel $282,150.00
<br />
<br />Bids were opened for the project stated above on Friday, March 13, 1998. Transmitted herewith are ten
<br />(10) copies of the bid tabulation for your information and file. Copies will also be distributed to each
<br />bidder .....
<br />
<br />The following summarizes the results of the five bids received.
<br />
<br /> .. contractor .... · "~ ~. ,' ........-... Base Bid
<br />
<br />The loW bidder on the project was EnComm Midwest, LLC with a Base Bid of $223,422.50. These bids
<br />have been reviewed and found to be in order.
<br />
<br />This project was bid with several alternate items. The following recommendations are for each alternate.
<br />
<br />Alternate No. 1 specified the installation of a 16" watermain to be used as a raw water line between Pump
<br />Facility No. 3 and No. 4. Since the county is proceeding with the plans to extend County Road 116, 16"
<br />finish water main in addition to the I0" raw water main will be required along Ramsey Boulevard in the
<br />near future. Since there are no significant cost savings associated with installing the 16" watermain at this
<br />time, we recommend that the City reject this alternate. Total Alternate No. 1 = $74,405.00
<br />
<br />Alternate No. 2 specified a 10' raw water main to be installed between Pump Facility No. 3 and No. 4.
<br />This alternate is the minimum piping alternate necessary io be installed by the City at this time. We
<br />recommend that the City accept this alternate. Total Alternate No. 2 '-- $45,870.00
<br />
<br />Alternate No. 3 specified the installation of both the I0" and J 6" water mains as part of this project. Since
<br />there was no significant cost savings associated with this alternate, we recommend that the City reject this
<br />alternate. Total Alternate No. 3 = $121,285.00
<br />
<br />2335 '06rest Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311
<br />
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br /> I
<br />I
<br />
<br />
<br />
|