My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 04/14/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:34:27 PM
Creation date
9/16/2003 2:12:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of RAMSEY Public Works <br /> Activity Report for March 1998 <br /> <br />Snow Removal <br /> <br />Very little activity throughout the month. Followed up with a small number of citizens who had <br />complaints on p~owing issues. <br /> <br />New 2 1/2 ton truck was ordered during the month. The box, wing and plow will be ordered in April <br />to coincide with the delivery of the truck. Estimated delivery date is mid to late December. <br /> <br />Streets Update <br /> <br />Some sign work was completed along with minor road repairs. More extensive repairs will be <br />done after street sweeping project is complete. <br /> <br />Xenolth St. from County 64 to 178th Ln is beginning to have bad spots surfacing. City Eng. will be <br />asked to prepare a quote for improvements. <br /> <br />Completed sweeping on aprox 1/3 of city's streets. Had some delay due to weather. (Rain <br />standing on streets.) <br /> <br />Some minor storm drain repair conducted through out the month. <br /> <br />Parks/Utilities Update <br /> <br />Well ~4 blasting took place during month in an attempt to bring water output up to an acceptable <br />level. The city did receive some complaints due to the blasting. 1 homeowner reported a broken <br />window. The issue was turned over to the well driller for action. <br /> <br />Preliminary SCADA installation activities taking place in March. Completion should be in April. <br />Interior painting, including floor, at well house #1 almost complete. <br /> <br />Conducted flow tests for commercial developments. <br /> <br />Pump repaired at Central Park for irrigation system, a Clay Valve will be installed and system <br />should be operational shortly. <br /> <br />Utilized College/High School students during spring break week to do some spring preparations <br />despite poor weather. <br /> <br />Equipment Issues <br /> <br />What broke: <br /> -Sweeper (#612) had engine repairs with alternator replaced <br /> -Loader (#601) Broke a serpentine belt <br /> -Snowplow truck (#624) hydraulic pump problems <br /> -1 ton truck (#615) had transmission lines replaced <br /> -Mower (#623) had starter rebuilt <br /> -Mowers (#613/616) had body work and painting done along with misc. mechanical <br />repairs <br /> -Trucks (#625/626) had receiver hitches installed <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.