Laserfiche WebLink
-Truck (#606) estimated body work $1064.00 <br />Misc. <br /> <br />Monthly meeting for March was canceled due to street sweeping schedule <br /> <br />Loading dock in metal building was removed, hole in floor will be filled with concrete during April. <br /> <br />Walkway at the Park Center building will be repaired during April. <br /> <br />Floating boardwalk at Fox park will be repaired early April. <br /> <br />Interviewed 1 internal candidate for PW position who later turned down application. <br /> <br />Hired (2) pad-time 40 hr/week employees. <br /> <br />Temp summer help will be at 100% of desired level (Had to turn down several people) <br /> <br />Dean Kapler <br /> <br /> I <br /> <br />I <br /> <br /> <br />