My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 05/12/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:35:03 PM
Creation date
9/16/2003 2:29:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br /> <br /> CHANGE ORDER NO. 1 FOR IMPROVEMENT PROJECT//98-13 <br /> CASING PIPES FOR C.tL #116 CROSSING <br /> By: Steve Jankowski, City Engineer <br />Background: <br /> <br />CASE #2 <br /> <br />Improvement Project #98-13 involves the fitting of Well No. 4 with a pump and transmission <br />main. The project has 2,000 feet of 10-inch transmission pipe from Well No. 4 to the well house <br />containing Well #3. This ten-inch transmission mai# crosses the future C.R. #116 extension. <br />Although the County does not require casing pipe under its roadway (the State of Minnesota, <br />MnDOT does), casing the crossing has significant advantages thould it be necessary to repair the <br />main at some point in the future. (1) It greatly reduces the cost of excavating the roadway for <br />repair, (2) avoids patching of a major county arterial roadway. (3) eliminates inconvenience <br />caused by traffic control associated with detouring of the highway during repair, and (4) greatly <br />increases the safety of the workers by making the repair outside of traffic. <br /> <br />Attached is a proposal for the installation of casing pipe associated with the Well No. 4 <br />transmission main and other future crossings of watermain beneath the roadway. Item #1 is a <br />cost of $8,700 for casing the 10-inch transmission main. Because the contractor has already <br />started installation, I have authorized this work to be done to avoid delay damages. Item #2 calls <br />for the extension of a 12-inch watermain and casing on the west side of C.R. #56. This work has <br />not been authorized. Finally, item #3 presents prices for installing a casing pipe of various sizes <br />for future use in installing sewer and water casing pipes to avoid boring and jacking costs which <br />will cost up to $16,000 per crossing. I have included a sketch illustrating where future <br />watermain crossing of the highway would be located consistent with our current comprehensive <br />water system plan. <br /> <br />Recommendation: <br /> <br />Staff recommends that a change order be authorized in the amount of $24,380, to install the <br />following casing pipes for watermain crossings of C.R. #116. <br /> <br /> Item #1 As per proposal $8,700 <br /> Item #2 As per proposal $9,800 <br /> <br />Item #3 <br /> <br />80 ft. of 20" steel pipe @ $39.00/fL $3,120 <br />80 ft. of 12" steel pipe ~ $31.00/ft. $2,460 <br />Bulkhead steel pipe ~ both ends - 2 ea. @ $150.00/ea. $ 300 <br /> Total $5,880 <br /> <br />Committee Action: <br /> <br />Motion to recommend that City Council authorize C.O. #1 in the amount of $24,380 for existing <br />and future casing pipes. <br /> <br />RevieW, ed by: <br />City Administrator <br />City Engineer <br />Director of Public Works <br />Acting Finance Officer <br />Parks/Utilities Supervisor <br /> <br />R&B: 05/06/98 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.