My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 05/26/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:36:18 PM
Creation date
9/16/2003 2:39:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. Item Unit <br /> <br />Contract <br />Quantity <br /> <br /> 1 Connect to existing 10' water main EA ! <br /> <br /> 2 Connect to pitless adaptor EA 1 <br /> <br /> 3 10" DIP, Cl. 52, 8'-10'deep in place LF 410 <br /> 4 10' 90 degree bend EA <br /> 5 10" x 10" tee EA 2 <br /> <br /> 6 10" MJ plug . EA 2 <br /> <br /> 7 I0" x o" tee EA 1 <br /> 8 6" hydrant EA 1 <br /> <br />9 6" D.I.P., Class 52, 8' deep in place LF 10 <br />10 6" gate valve and box EA 1 <br />11 10" gate valve andbox EA 1 <br />12 3" P.V.C. drain pip~ LF 5 <br />13 Drainfield rock w/polyethyler~ CY 3 <br />14 4" thick concrete sidewalk SF 250 <br />15 6" thick concrete transformer pad LS 1 <br />16 6" steel bollards EA 2 <br />17 Class V aggregate base TN 50 <br />18 Common fill (Site No. 4) CY 400 <br />19 Black dirt CY 100 <br />20 Bituminous base TN 10 <br />21 Bituminous wear TN 10 <br />22 Topsoil CY 100 <br />23 Site seeding AC 4.0 <br />24 Prairie restoration (Site No. 3) LS 1 <br />25 Silt fence LF 2,400 <br />26 Salvage and reinstall topsoil LS 1 <br /> Total Part t - SiteWork <br /> <br /> Part 2 - Pumphonse <br /> <br />27 Construct pumping facility f'or Well No. 4 <br /> including valve vault structure, interior piping, <br /> valves, well pump, electrical controls, mechanical <br /> <br /> equipment and correlated appurtenances LS <br /> <br />28 Construct Well No. 3 modifications, including <br /> <br /> interior piping, flow meter, chemical feed equip., <br /> mechanicaI equip. & correlated appurtenancm I_3 <br /> Total Part 2 - Pumphouse <br /> <br />Total Part I - Site Work <br /> <br />Total Part 2 - Pumphouse <br /> <br />k\438',,43806',.R EQU E S T.WB 2 <br /> <br /> Unit <br />Price <br /> <br />11,000.00 <br />800.00 <br />23.00 <br />250.00 <br />350.00 <br />50.00 <br />295.00 <br />1,950.00 <br />I6.00 <br />475.00 <br />1,050.00 <br />21.50 <br />65.00 <br />3.00 <br />450.00 <br />350.00 <br />9.00 <br />8.00 <br />14.00 <br />55.00 <br />55.00 <br />14.130 <br />800.00 <br />Z000.00 <br />1.80 <br />950.00 <br /> <br />I60,240.00 <br /> <br />16,500.00 <br /> <br />Quantity <br /> to Date <br /> <br /> I <br /> <br /> 0 <br /> <br />205 <br /> <br /> I <br /> <br /> 1 <br /> <br /> I <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br /> 0 <br /> <br />0.50 <br /> <br /> Amount <br /> to Date <br /> <br /> 11,000.00 <br /> <br /> 4,715.00 <br /> 250.00 <br /> 350.00 <br /> <br /> 50.00 <br /> <br /> 475.00 <br />$16,840.00 <br /> <br /> 2,700.00 <br /> <br /> 300.00 <br /> $3,000.00 <br /> <br /> 16,840.00 <br /> 3,000.00 <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.