Laserfiche WebLink
I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br />,'~ <br /> ! <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br /> <br />Total Base Bid <br /> <br />Alternate No. 2 - Install 10" Water Main <br />39 10" gate valve & box w/extension stems EA <br />40 10" DIP, Cl. 52, 7' deep in place LF <br />41 Valve markers EA <br />Total Alternate No. 2- 10" Water Main <br /> <br /> Alternate No. 4 - Temporary Control Panels <br /> <br />55 Install temporary motor control panels <br /> <br /> at Pump Facility No. 4. <br /> <br /> Total Alternate No. 4 - Temp. Control Panels <br /> <br /> Chattge Order No. linstall steal carrier pipes <br />56 16" steel carrier pipe LF <br />57 Blow sand inside pipe EA <br />58 Install field lock gaskets EA <br /> Total Change Order No. I <br /> <br />Total Base Bid <br /> <br />Total Alternate 2 - 10" Water Main <br /> <br />Total Alternate 4 - Temp, Control Panels <br /> <br />Total Change Order No. 1 <br /> <br />Total Work Completed To Date <br /> <br />Stored Materials <br /> <br />10" DIP watermain, hydrant, and fittings <br /> <br /> Total <br /> <br />I:Vt38\43806\REQUEST,WB2 <br /> <br /> 2 <br /> <br />1,850 <br /> <br />160 <br /> <br /> 2 <br /> <br /> 8 <br /> <br />1,060.00 <br /> 23.60 <br /> 45.00 <br /> <br />3,600.00 <br /> <br /> 47.15 <br /> <br />747.50 <br />120.75 <br /> <br /> 1 <br /> <br />1,700 <br /> <br /> 1 <br /> <br />80 <br /> <br /> 0 <br /> <br /> 4 <br /> <br />$ i 9,840.00 <br /> <br /> 1,060.00 <br />40,120.00 <br /> <br /> 45.00 <br /> <br />$41,225.00 <br /> <br />$0.00 <br /> <br />3,772.00 <br /> <br /> 483.00 <br /> <br />$4,255.00 <br /> <br />$19,840.00 <br />$41,225.00 <br /> <br /> $0.00 <br /> $4,255.00 <br /> <br />$65,320.00 <br /> <br />6,119.73 <br /> <br />$6,119.73 <br /> <br /> <br />