Laserfiche WebLink
! <br />I <br /> <br />Steve Jankowski <br />Page 2 <br />June 10, 1998 <br /> <br />II. TechnicaI Services <br /> <br />Ac <br /> <br />Services provided by Hakanson Ander,,~on Associates, lnc.: <br /> <br />· Provide construction staking and inspection. <br />· Preparation of as-built plans. <br />· Order and review soil boring and testing. <br /> <br />Estimated cost of technical services provided by <br />Hakanson Anderson Associates: <br /> <br />$10,800 <br /> <br />B. Services provided by STS Consultants. Ltd.: <br /> <br />· Soil borings <br />· Compaction testing <br /> <br />Estimated cost of technical services provided by STS Consultants; $ 1,900 <br /> <br />Ill. A & R Manufacturing. Site <br /> <br />· Prepare Grading & Drainage Plan <br />· Review Runoff & Ponding Requirements <br /> <br />Estimated "not to exceed" cost: <br /> <br />~ 1,800 <br /> <br />All of the above costs are based on our current hourly rates and the estimated cost <br />of the basic engineering services is a f'not to exceed" cost. The cost of the technical <br />services is an estimated cost and will .depend on tho contractor and the weather <br />conditions during construction. We will bill the cost of soil borings and compaction <br />testing at the actual cost plus five percent for administration. <br /> <br />Following is a proposed schedule based on a start date of June 17, 1998. <br /> <br />TASK <br />Prepare plat and plans and specifications and submit to <br />reviewing agencies for permits <br />Submit to City Council to set the bid date <br />Award bids <br />Begin construction <br />Complete construction and restoration <br /> <br />COMPLETION DATE <br /> <br /> July 24, 1998 <br />July 28, 1998 <br />August 25, 1998 <br />September 7, 1998 <br />October 31, 1998 <br /> <br />Il <br /> <br />Hakanson <br />Anderson <br />Assoc.,Inc. <br /> <br /> <br />