Laserfiche WebLink
CASE # I <br /> <br />UPDATE ON T.H. ~q47 STP PROJECT <br />(IMPROVEMENT PROJECT #98-14) <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />The T.H. f/-47 STP Project was announced in February 1998. The City has retained SI[F, Inc. to <br />prepare plans and specifications and necessary environmental documents, and Evergreen Land <br />Services, Inc. to perform the necessary land and right-of-way acquisition for this project. The <br />last progress report was made at the April 28,1998 Road and Bridge Committee meeting. Since <br />that report, the following significant project events have occurred: <br /> <br />On May 4, 1998, the City held a public hearing on the project ~ City Hail. A record of <br />meeting highlights is attached. <br /> <br />A Project Path Report has been prepared and submitted and accepted by MnDOT. This <br />report serves as a seeping document of the impact the project will have on the area and <br />the environment. <br /> <br />We have received comments on the project fi.om the Anoka County Highway Department <br />and Paul and Kimberl7 Foss of the Willow Ridge subdivision. Both documents, which <br />are attached, have been sent to SKF, Inc. <br /> <br />We have received a letter from MnDOT dated June 2, I998, advising the City that it is <br />now authorized to proceed with the environmental assessment and that property can now <br />be acquired under hardship or protective buys. <br /> <br />In addition to the T.H. g47 STP Project, the City has identified a number of additional projects <br />which ideally could be performed in conjunction with"the T.H. ~47 STP Project. erie project <br />that would be critically involved with the T.H. ~47 Project is the development of Sunwood Drive <br />from Sunny Ponds to I49th Avenue. This project involves the construction of'the fourth leg of <br />the integration. If not done concurrently with the T.H. g47 Project, additional costs can be <br />anticipated when the intersection is remodeled from three legs to four legs. Attached is a <br />proposal from SRF, Inc. to incorporate this work with the T.H. ~47 plans and specifications. <br />Many of the work tasks are similar to those being performed for the tdghway project such as <br />wetland delineation, soil boring, and surveying functions. A separate bid schedule could be <br />included with the T.H. g47 Project to avoid many of the overhead costs such as bid document <br />preparation, solicitation, and advertisement. The cost of th.is work is estimated at $31,000. <br /> <br />Finally, a revised project cost estimate was requested following the public hearing because <br />additional properties were identified for acq.uisition a~er the preliminary design was prepared. A <br />copy of tiffs estimate will be presented at the meeting. <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I, <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />