Laserfiche WebLink
Construction Cost Estimates for <br />Municipal Utilities Extension <br /> To Burger King Site <br /> <br />Sanitary Sewer <br /> <br />1050 Ft <br />850 Ft <br />2 each <br />2 each <br />200 Pt <br /> <br /> 27" Sanitary Sewer 18' dp <br /> 10" Sanitary Sewer 11-18' dp <br />· 60" Sanitary Manholes <br /> 48" Sanitary Manholes <br /> Bore and Jack Pipe <br /> <br />90/Ft <br />25~pr <br />2000/each <br />150 O/each <br />200/pr <br /> <br />Watermain <br /> <br />1050 Pr 8" Watermain <br />870 Pt 12" Watermain <br />5 each Hydrants <br />200 Pr Bore & Jack Pipe <br /> <br />22/Pr <br />35/Pr <br />1500 each <br />200/pr <br /> <br />Storm and Street Improvements <br /> <br />740 Pr 18" Storm Sewer <br />1 each 18" FFS <br />3 each Standard Manholes <br />2 each Standard Catch Basin <br />2000 Pt Cone. C & G <br /> <br />25/Pr <br />700 Each <br />1500/each <br />1000/Each <br />7.50/ft <br /> <br />Re~toration <br /> <br />2700 sq. yd. Pavement Removal <br />1100 ton Class 5 Base <br />500 ton Bituminous <br />4500 yd Sodding <br />1.2 aC.R.e Seed and Mulch <br /> <br />2/sq. yd. <br />7/ton <br />27/ton <br />1.50/yd <br />1500/acre <br /> <br />$ 94,500 <br />$ 21,250 <br />$ 4,000 <br />$ 3,000 <br />$ 40.000 <br />$162,750 <br /> <br />$ 23,100 <br />$ 30,450 <br />$ 7,500 <br />$ 40,000 <br />$101,050 <br /> <br />$18,500 <br />$ 700 <br />$ 4,500 <br />$ 2,000 <br />$15.000 <br />$40,700 <br /> <br />$ 5,400 <br />$ 7,700 <br />$13,500 <br />$ 6,750 <br />$1.800 <br />$35,150 <br /> <br /> <br />