My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 08/25/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:39:48 PM
Creation date
9/17/2003 11:34:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract <br />No. Item Unit Quantity <br /> <br /> I Connect to existing 10" water main EA 1 <br /> 2 Connect to pitless adaptor EA 1 <br /> <br /> 3 10" DIP, Cl. 52, 8'-10' deep in place LF 410 <br /> 4 10" 90 degree bend EA 2 <br /> 5 10" x 10" tee EA 2 <br /> 6 t0" MJ plug EA 2 <br /> 7 10" x 6" tee EA 1 <br /> 8 6" hydrant EA 1 <br /> 9 6" D.I.P. Class 52, 8' deep in place LF 10 <br /> 10 6" gate valve and box EA. 1 <br /> 11 10" gate valve and box EA I <br /> 12 3" P.V.C. drainpipe LF 5 <br /> 13 Drainfield rock w/polyethylene CY 3 <br /> 14 4" thick concrete sidewalk SF 250 <br /> 15 6" thick concrete transformer pad LS .' 1 <br /> 16 6" steel bollards EA 2 <br /> 17 Class V aggregate base TN 50 <br /> 18 Common fill (Site No. 4) CY 400 <br /> <br /> 19 Black dh't CY 100 <br /> 20 Bitun'ffnous base TN 10 <br /> 21 · Bituminous wear TN 10 <br /> 22 Topsoil CY 100 <br /> 23 Site seeding AC 4.0 <br /> 24 Prairie restoration (Site No. 3) LS 1 <br /> 25 Silt fence LF 2,400 <br /> 26 Salvage and reinstall topsoil LS 1 <br /> Total part 1 - Site Work <br /> <br /> Part 2 - Pumphouse <br /> <br /> 27 Construct pumping facility for Well No. 4 <br /> including valve vault structure, interior piping, <br /> valves, well pump, electrical controls, mechanical <br /> <br /> equipment and correlated appurtenances LS l <br /> <br /> 28 Construct Well No. 3 modifications, including <br /> <br /> interior piping, flow meter, chemical feed equip., <br /> mechanical equip. & correlated appurtenanc~ LS l <br /> Total Part 2 - Pumphouse <br /> <br /> Total Part 1 - Site Work <br /> Total Part 2 - Pumphouse <br /> Total Base Bid <br /> <br />h~438\43806",,q. EQ U EST3.WB2 <br /> <br /> Urfit <br /> Price <br /> <br />I <br /> <br /> 800.00 <br /> <br /> 23.00 <br /> 250.00 <br /> 350.00 <br /> <br /> 50.00 <br /> <br /> 295.00 <br /> 1,950.00 <br /> <br /> 16.00 <br /> <br /> 475.00 <br /> <br /> 1,050.00 <br /> 21.50 <br /> 65.00 <br /> <br /> 3.00 <br /> 450.00 <br /> <br /> 350.00 <br /> 9.00 <br /> 8.00 <br /> 14.00 <br /> 55.00 <br /> 55.00 <br /> <br /> I4.00 <br /> 800.00 <br /> <br /> 1.80 <br /> 950.00 <br /> <br />16,500.00 <br /> <br />Quantity <br /> to Date <br /> <br /> I <br /> I <br /> <br /> 410 <br /> 2 <br /> 2 <br /> 2 <br /> 1 <br /> <br /> 10 <br /> I <br /> 1 <br /> 0 <br /> 0 <br /> 0 <br /> I <br /> 2 <br /> 0 <br /> 52 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> 1.00 <br /> <br /> 56,I00 <br /> 15,220 <br /> <br /> Amount <br /> to Date <br /> <br /> I 1,000.00 <br /> 800.00 <br /> 9,430.00 <br /> 500.00 <br /> 700.00 <br /> I00.00 <br /> 295.00 <br /> 1,950.00 <br /> 160.00 <br /> 475.00 <br /> 1,050.00 <br /> <br /> 450.00 <br /> 700.00 <br /> <br /> 416.00 <br /> <br /> 950.00 <br /> $28,976.00 <br /> <br /> 56,100.00 <br /> <br /> 15.220.00 <br /> $71,320.00 <br /> <br /> 28,976.00 <br /> <br /> 71.320.00 <br />$100,296.00 <br /> <br />I <br />I <br />! <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.