My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/25/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 08/25/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:39:48 PM
Creation date
9/17/2003 11:34:37 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/25/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />Alternate No. 2 - Install 10" Water Main <br />39 10" gate valve & box w/extension stems EA <br />40 10" DIP. Cl. 52.7' deep in place LF <br />41 Valve markers EA <br />Total Alternate No. 2 - 10" Water Main <br /> <br /> Alternate No. 4 - Temporary Control Panels <br /> <br />55 Install temporary mofor conlxol panels <br /> <br /> at Pump Facility No. 4. <br /> <br /> Total Alternate No. 4 - Temp. Control Panels <br /> <br />LS <br /> <br /> Change Order No, linslall steel carrier pipes <br /> <br />56 16" steel carder pipe LF <br />57 Blow sand inside pipe EA <br />58 Install field lock gaskets EA <br /> Total Change Order No. 1 <br /> <br />Change Order No. 2 <br />59 Install a 12" D.I.P at varying depths 7-10 ft FT <br />60 Install a 12" G.V. and box EA <br />61 Install aa 18" steel carder pipe, 0.25" wall <br />thick LF <br />62 Blow sand inside carder pipe EA <br />63 Install field-lok or fast grip gaskets on each <br />watermain joint EA <br /> <br />64 Remove and reinstall the 12" MJ. plug <br /> <br /> removed from the cross reinstall on watermn. EA <br />65 Install an 18" stl. carrier pipe for future <br /> <br /> watermain FT <br />66 Install a 16" steel cartier pipe fora future 8" <br /> watermain FT <br />67 Insulation FTsq <br /> Total Change Order No. <br /> <br />Total Base Bid <br /> <br />Total Alternate 2 - 10" Water Main <br /> <br />Total Alternate 4 - Temp. Control Panels <br /> <br />Total Change Order No. 1 <br /> <br />Total Change Order No. 2 <br /> <br />Total Work Completed To Dat~ <br /> <br /> 2 <br /> <br />1,850 <br /> <br /> 2 <br /> <br />160 <br /> <br /> 2 <br /> <br /> 8 <br /> <br />I00 <br /> <br /> I <br /> <br />80 <br /> <br /> 1 <br /> <br />80 <br /> <br />8O <br /> <br />8OO <br /> <br />1,060.00 <br /> 23.60 <br /> 45.00 <br /> <br />3,600.00 <br /> <br /> 47.15 <br /> <br />747.50 <br />120.75 <br /> <br /> $33.35 <br />$1,440.00 <br /> <br />$57.50 <br />$828.00 <br /> <br />$132.00 <br /> <br />$42.5O <br /> <br />$40.00 <br />$1.45 <br /> <br /> 2 <br /> <br />1,873 <br /> <br /> 2 <br /> <br />160 <br /> <br /> 2 <br /> <br />10 <br /> <br />92.50 <br /> <br /> 1 <br /> <br />80 <br /> <br /> I <br /> <br />8OO <br /> <br /> 2,120.00 <br />44,202.80 <br /> <br /> 90.00 <br /> <br />$46,412.80 <br /> <br />$3,600.00 <br /> <br />7,544.00 <br />1,495.00 <br />1,207.50 <br /> <br />$10,246.50 <br /> <br />3,084.88 <br />1,440.00 <br /> <br />4,600.00 <br /> <br /> 828.00 <br /> <br />660.00 <br /> <br />1,160.00 <br /> <br />$1~172.88 <br /> <br />$100,296.00 <br />$46,412.80 <br />$3,600.00 <br />$10,246.50 <br />$12,172.88 <br /> <br />$172,728.18 <br /> <br />I:~t38\43806'~q EQU EST3.WB2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.