Laserfiche WebLink
! <br />! <br />! <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />· Jim shared ideas on location and design of a nut/bolt cabinet and how it would work in the <br /> new area. <br /> <br />· Discussion ensued on location of lockers and changing area and location of table and chairs. <br /> <br />· Maintenance of the building has been budgeted for 1999. <br /> <br />· It was discussed whether a plate switch should be installed at every door. Other options <br /> could be to leave lights on all day or install a motion sensor. <br /> <br />METAL BUILDING UPDATE <br /> <br />· Doors are in. <br /> <br />· Merle is checking into the electrical work to be done. <br /> <br /> · Cleaning will be done soon. Vehicles will be able to be stored outside and the bikes should <br /> be able to be sold along with excess furniture from the Municipal Center. <br /> <br />· Brackets are needed to hold the metal gate in place. <br /> <br /> REVIEW GOALS AND OBJECTIVES <br /> <br />STREETS <br /> <br />· On road vegetation control. <br /> <br />· Storm water maintenance inspection system. <br /> <br />· Utilize the Department in rating the streets for maintenance. <br /> <br />PARKS/UTILITIES <br /> <br />· Beautify the City parks and trails. <br /> <br />· More communication with the community on the parks and trails system. <br /> <br />· Provide easier access to the cemetery. <br /> <br />· Flush hydrants more often. <br /> <br />ENGINEERING <br /> <br />· Update City map. <br /> <br />· Create a database of the storm water utility system. <br /> PUBLIC WORKS/AUGUST 26, 1998 <br /> Page 2 of 4 <br /> <br /> <br />