Laserfiche WebLink
6.3. Any part of a scheduled mowing that is canceled due to inclement weather shall be <br />rescheduled by the contractor to the following day of the cancelation. The City may, at <br />its option, elect not to reschedule any part of a mowing. Any portion of a mowing that <br />is canceled and not rescheduled shall not result in a mowing charge. <br />6.4. In areas of poor drainage which adversely affect the work of the Contractor, the <br />Contractor shall be responsible for informing the City Parks Supervisor of the affected <br />area. The Parks Supervisor will have discretionary authority to waive work quality <br />standards in areas which both the Parks Supervisor and the Contractor agree are <br />problematic. <br />6.5. The City reserves the right to cancel the weekly mowing if conditions indicate that <br />mowing is not needed. For example if conditions are too warm, cold, wet or dry to <br />require mowing. The Contractor will be notified that mowing is canceled by Friday of the <br />week before mowing. <br />7. Additional Requirements <br />7.1. All contractor vehicles are required to have strobe lights and back up alarms on any <br />vehicles driving in parks or on trails. Contractor vehicles must also have contractors <br />name prominently displayed. <br />7.2. Contractor vehicles must also go no more than 5 miles an hour on trails. Contractor <br />vehicles and mowers must also yield to park users. <br />7.3. Contractor or contractor employees must also have the contractors name prominently <br />displayed on their uniform or vest. <br />7.4. Contractor has personally walked and inspected the entire site prior to submitting bid. <br />141 <br />