My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/1998
Ramsey
>
Public
>
Agendas
>
Council
>
1998
>
Agenda - Council - 11/10/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:42:54 PM
Creation date
9/18/2003 8:50:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />Site Plan Review: Sharp & Associates <br />Page 3 of 3 <br />10/29/98 <br /> <br />Drainage and Grading: The only drainage directed to 140th Avenue is confined to the <br />two driveway accesses. The front parking lot is conveyed to a catch basin which is <br />proposed to discharge into the existing storm catch basin located on the northeast corner <br />of the property. Consideration should be given to redirecting this outlet to the basin <br />located rnidway along the west botmdary. There is no existing stub in the structure where <br />the plan proposes to connect, but a 15 inch stub is available in the midline manhole. The <br />developer will be responsible for restoration work associated with connecting into either <br />structure. The building and remainder of the site drain through a series of three catch <br />basins to an existing manhole located midway along the southern site boundary. This <br />storm drainage plan is consistent with the overall plan for this portion of the industrial <br />park. <br /> <br />Building Height: The proposed building height as defined by City Code is 24 feet. (The <br />building is 22 feet tall on the north side and 26 feet tall on the south side.) The building <br />height complies with the City Code maximum height of 35 feet. <br /> <br />Architectural Standards: In accordance with City Code and the Business Park 95 <br />covenants, the exterior building materials are proposed to be a combination of smooth <br />face and rock face concrete masonry units. <br /> <br />Business Park 95 Covenants: The site plan is subject to the review of the Business Park <br />95 Architectural Review Board. The date and time of that meeting will be announced at a <br />later date. <br /> <br />The Ramsey Planning Commission will be meeting to review the proposed site plan on <br />Monday, November 2, 1998, at 7:30 p.rn. Staff suggests that you, or your representative, <br />be present at this meeting to answer any questions that may arise. <br /> <br />Enclosed for your information is a copy of the case cover sheet for the Planning <br />Commission meeting. If you have any questions, please do not hesitate to contact us at <br />427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Administrator <br /> <br />Sean J. Walther <br />Community Dev. Asst. <br /> <br />City Engineer <br /> <br />Reviewed By: <br />Cindy Sherman, Community Development Director <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.