My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/04/1998
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1998
>
Agenda - Planning Commission - 08/04/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:10:17 AM
Creation date
9/18/2003 10:33:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/04/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />Except for the Permittee's personal equipment and property, only equipment required for <br />the excavation and grading materials shall be allowed onto the site. Equipment associated <br />with the processing of the excavated materials such as crushers, washers, conveyors, etc., <br />are prohibited. <br /> <br />Ali work sites shall be properly safeguarded to prevent the general public from depositing <br />garbage or other refuse on the work site. <br /> <br />Prior to the removal of any trees, the City Engineer shall be notified at least 72 hours in <br />advance of the removal so that the number of trees required for reforestation can be <br />determined. <br /> <br />Grading operations shall be conducted in such a manner to minimize interference with the <br />surface water drainage outside the boundkries of the operation. <br /> <br />Fencing may be ordered by the City Council or City Engineer anytime the permit is in <br />force and shall be installed within 24 hours of written notice. <br /> <br />The maximum slope other than the working face shall be sloped on all sides no steeper <br />than a rate of 2 foot horizontal to 1 foot vertical. In no case shall the slope of the working <br />face be left unattended with a slope greater than 2 feet horizontal to t foot vertical. When <br />mining operations are anticipated to be discontinued for an interval greater than two <br />working days, the slopes shall be flattened to a grade no steeper than 4 feet horizontal to 1 <br />foot vertical. Final slopes shall be consistent with the plan submitted and shall be no <br />steeper than 12 feet horizontal to 1 foot vertical by modifying the submitted grading plan <br />accordingly. <br /> <br />Prior to commencing any grading operations, a cash escrow or letter of credit approved as <br />to form by the City in the amount ofTen Thousand Dollars and no cents ($10,000.00) shall <br />be deposited with the City. This financial guarantee may be used by the City to pay for the <br />cost and expense of repairing any public right of ways or regrading and stabilizing eroded <br />areas due to the grading operation, pay for any cost associated in administering the <br />requirements of this Chapter of the City Code, and to pay for any restoration of the work <br />site not properly restored upon completion. The Permit Holder agrees to permit access to <br />the property by the City to facilitate restoration, if necessary. <br /> <br />The Permittee shall implement sediment and erosion control practices. No grading activity <br />shall occur within twenty-five (25) feet of a property line unless silt fence is placed along <br />the property line to prevent sediment from washing onto the adjoining property. Any <br />erosion which causes gullies of greater than one (1) foot within twenty-five (25) feet of a <br />property line shall be regraded within forty-eight (48) hours of the precipitation event that <br />caused the erosion. <br /> <br />RESOLUTION #98-08- <br />Page 2 of 5 <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.