My WebLink
|
Help
|
About
|
Sign Out
Home
02/17/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
02/17/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:15:23 AM
Creation date
9/18/2003 11:29:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
02/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· Warrants Traffic Signal Warrant A~alysis, Version 3.04 Page 2 <br /> :rant Study Data File: C:\APPS\PETRA2\DATAF~LE\TMC9731.WAR; Time of Report: 11/12/199~; 13:02:09 <br /> <br /> ~ran= Summary: <br /> esl values apply. <br /> <br /> crant I - Minimum Vehicular Volumes <br /> ~OT SATISFIED. Required values reached for B hours. Criteria--Main St.: 420; Side St,: See Volume Summary, <br /> <br /> rrant 2 - Interruption of Continuous Traffic <br /> NOT SATISFIED. Required values reached for 2 hours. Criteria--Main St.~ 630; Side St.: See Volume Summary. <br /> <br /> rrant 3 - Minimum Pedestrian Volumes <br /> NOT SATISFIED. Pad volumes too low. Criteria~-190 Pads in peak hour. 100 pads in 4~h high hour. <br /> <br /> rrant 4 - School Crossing <br /> <br /> NOT APPLICABL~. Gap data has not been defined. <br /> <br /> rrant S - Progressive Movement <br /> NOT SATISFIED. Adjacent signals closer than 1000 feet and/or not part of coordinated system. <br /> <br />rrant 6 - Accident Experience <br /> NOT SATISFIED. 0 correctable accidents is fewer than required S. <br /> Correctable Accidents: 0; Right Angle Accidents: 0; Lef~ Turn Accidents: 0; Other A ccidsn~s: 0, <br /> <br />~rrant 7 - Systems Warrant <br /> <br /> NOT SATISFIED. At least one street has no major approaches. Peak hour total entering volume= 1005. <br /> <br /> - Approaches which are part of the principal through traffic roadway network. <br /> - Approaches which include rural or suburban highways outside, entering or traversing a city. <br /> - Approaches which appear as a major route in an official transportation plan. <br /> <br />~rrant 8 - Combination of Warrants <br />ROT SATISFIED. Required values reached for 5 hours, Criteria--Main: 504; Side: See Volume Summary, <br /> <br />~rrant 9 - Four ~our Volumes <br />SATISFIED for 4 hours. <br /> <br />~rrant 10 - Peak ~our Delay <br />NOT SATISFIED. Peak hour (1600 hours) volume not adequate. <br /> Criteria--Main St.: 800 (4 approaches), 650 (3 approaches); Side St.: 100. <br /> <br />~rTant 11 - Peak ~our Volume <br />SATISFIED for 3 hours, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.