Laserfiche WebLink
UPDATE ON ANOKA COUNTY 2015 TRANSPORTATION PLAN <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />Anoka County is in the process of updating its Comprehensive Transportation Plan. A single <br />copy was made available to the City of Ramsey, and the Road and Bridge Committee reviewed <br />the major elements affecting the City at its December 16, 1997 meeting. Direction was made at <br />that meeting to submit a written response to the County with regard to three specific issues. <br />Attached is the response letter which I prepared at the Committee's direction. <br /> <br />RB CASE <br /> <br />Also the Committee requested a meeting with Anoka County to discuss some of these issues, <br />particularly the proposal to upgrade Highway #10 to a four-lane freeway east of Armstrong <br />Boulevard. I have contacted both County Engineer Jori Olson and County Commissioner Dennis <br />Berg who have indicated they will be in attendance at the meeting. In addition to the above <br />referenced 2015 Transportation Plan issues, additional topics of discussion could include the <br />C.R. #116 highway extension project and the signalization of the C.R. #116 Dysporosium/Xkimo <br />intersection. <br /> <br />Committee Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />Fire Chief/Director of Public Works <br />City Administrator <br /> <br />R&B: 02/24/98 <br /> <br />/jmtf2O l $.doc <br /> <br /> <br />