My WebLink
|
Help
|
About
|
Sign Out
Home
02/17/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
02/17/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:15:23 AM
Creation date
9/18/2003 11:29:01 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
02/17/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 3, 1997 <br /> <br />Steven Jankowski <br />City of Ramsey <br />15153 Nowthen Blvd NW <br />Rarnsey, M~ 55303 <br /> <br /> COUNTY OF ANOKA <br /> Public Services Division <br /> <br />HIGHWAY DEPARTMENT <br />1440 BUNKER LAKE BLVD NW, ANDOVER, MINNESOTA 55304 <br />(612) 754-3520 FAX (612) 754-3532 <br /> <br />RE: Traffic Studies in Ramsey <br /> <br />Dear Steven: <br /> <br />Enclosed is a list of 1997 warranted signal locations, and copies of the Manual Traffic Counts completed <br />in 1997 within the City of Ramsey. Results of the Traffic Studies are summarized as follows: <br /> <br />Location Date Results <br /> <br />CSAH 1 I6 (Industry Ave) ~ Dysposium St/Thurston Ave. 11/7/97 <br /> <br />Stop Warrant Met; <br />Peak Hour Signal Warrant Met; <br />Four Hour Signal Warrant Met <br /> <br />The intersection of CSAH 116 (Industry Ave) ~ Dysposium St/Thurston Ave. warrants signalization. This <br />location has been added to our list of warranted signal locations. The Anoka County Publics Works <br />Committee will soon be prioritizing these locations along with other warranted signal locations on the <br />County Highway System, to determine which signals will be designed and let as construction projects in <br />1998. <br /> <br />Please contact Jane Pemble, Traffic Engineer, to discuss the results of these traffic studies, and your views <br />on the City of Ramsey signal priorities. We anticipate that our '98 design/construction schedule will be <br />debided by early February, and we would appreciate your input prior to February 1, 1998. In addition, let me <br />know the locations within the City of Ramsey that you would like Traffic Studies conducted during 1998. <br /> <br />Sincerely <br /> <br />Traffic Engineering Technician <br /> <br />rlb/ra97sig <br /> <br />Affirmative Action / Equal Opportunity Employer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.