Laserfiche WebLink
December 3, 1997 <br /> <br />Steven Jankowski <br />City of Ramsey <br />15153 Nowthen Blvd NW <br />Rarnsey, M~ 55303 <br /> <br /> COUNTY OF ANOKA <br /> Public Services Division <br /> <br />HIGHWAY DEPARTMENT <br />1440 BUNKER LAKE BLVD NW, ANDOVER, MINNESOTA 55304 <br />(612) 754-3520 FAX (612) 754-3532 <br /> <br />RE: Traffic Studies in Ramsey <br /> <br />Dear Steven: <br /> <br />Enclosed is a list of 1997 warranted signal locations, and copies of the Manual Traffic Counts completed <br />in 1997 within the City of Ramsey. Results of the Traffic Studies are summarized as follows: <br /> <br />Location Date Results <br /> <br />CSAH 1 I6 (Industry Ave) ~ Dysposium St/Thurston Ave. 11/7/97 <br /> <br />Stop Warrant Met; <br />Peak Hour Signal Warrant Met; <br />Four Hour Signal Warrant Met <br /> <br />The intersection of CSAH 116 (Industry Ave) ~ Dysposium St/Thurston Ave. warrants signalization. This <br />location has been added to our list of warranted signal locations. The Anoka County Publics Works <br />Committee will soon be prioritizing these locations along with other warranted signal locations on the <br />County Highway System, to determine which signals will be designed and let as construction projects in <br />1998. <br /> <br />Please contact Jane Pemble, Traffic Engineer, to discuss the results of these traffic studies, and your views <br />on the City of Ramsey signal priorities. We anticipate that our '98 design/construction schedule will be <br />debided by early February, and we would appreciate your input prior to February 1, 1998. In addition, let me <br />know the locations within the City of Ramsey that you would like Traffic Studies conducted during 1998. <br /> <br />Sincerely <br /> <br />Traffic Engineering Technician <br /> <br />rlb/ra97sig <br /> <br />Affirmative Action / Equal Opportunity Employer <br /> <br /> <br />