Street Projects (continued) <br /> <br />It is also intended that all of the land, most of which is wetland, south of the right-of-way be <br />purchased for eventual nature preserve. As was the case in the 1991 improvement, the MSA <br />fund will provide for the entire cost of the roadway. It is suggested that, in addition to"the <br />roadway, an off-road trail be completed as an MSA eligible project expense. The major project <br />costs include land acquisition, construction costs, and project overhead. The total project cost is <br />estimated to be $836,000. <br /> <br />McKinley Street <br /> Commercial Asphalt/Jaspar <br /> <br />This project will complete McKinley Street as a collector street through the City's industrial area <br />from the eastern City limits to Ramsey Boulevard. It will serve the industrial and commercial <br />property north of the raikoad tracks and provide access frontage for the development of <br />properties to the north. The project would require the installation of approximately 3,000 feet of <br />roadway along with associated storm sewer. Sanitary sewer and watermain are either presently <br />in place or are anticipated to be in place prior to the construction of the roadway. The costs <br />associated with this improvement include right-of-way, construction costs and overhead. The <br />total project cost is estimated to be $830,000. <br /> <br />Sunwood Drive <br /> C.R. #56/C.R. #116 <br /> <br />This project proposed constructing approximately 2,400 feet of Sunwood Drive between two <br />existing segments of the roadway, completing a 2.3 mile continuous segment between the Sunny <br />Ponds subdivision and Ramsey Boulevard. This particular segment will have the benefit of <br />providing access to vacant land with industrial and commercial potential on both its north and <br />south sides. Major project cost include the construction costs and overhead associated with the <br />roadway, storm sewer, watermain, and sanitary sewer improvements. They may also require the <br />construction of a bridge over protected wetland 673W since a similar bridge was required over <br />wetland 114P between C.S.A.H. #5 and C.R. #57. The total project cost is estimated to be <br />1,000,000. <br /> <br />Riverdale Drive Extension <br /> <br />This project would extend to Riverdale Drive fi'ontage road to Ramsey Boulevard, a signalized <br />access point on T.H. #10. This segment would provide access to the vacant commercial property <br />on both the north and south sides of the development. The project would include the <br />construction of approximately 3,000 feet of roadway and related infrastructure improvements <br />including sanitary sewer, watermain and storm sewer. The total project cost includes <br />construction cost and overhead, as the right-of-way is anticipated to be dedicated by the <br />developer. The estimated cost is $650,000. <br /> <br /> <br />