My WebLink
|
Help
|
About
|
Sign Out
Home
04/21/98
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Road and Bridge Committee
>
Agendas
>
1998
>
04/21/98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 11:15:46 AM
Creation date
9/18/2003 11:34:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Road and Bridge Committee
Document Date
04/21/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
//I~t~ I.~ } t~ ~,.~,,~, <br />Access Control <br /> / <br />The project proposes construction of a raised median along th,,/entire corridor. This will create a <br />right-in/right-out only situation for all driveways and side st~teets except for 142nd Avenue NW, <br />Nowthen Boulevard (CSAH 5), 149th Avenue NW, 194th' Lane NW and 153rd Avenue NW. <br />These streets will have full access and mm lanes provided on the mainline. <br /> <br />In addition, access rights will be obtained from the property between 142nd Avenue NW and <br />CSAH 5 on the east side of the roadway and on the property that is being acquired with the <br />purchase of the eleven single family homes. <br /> <br />.;3icycles and Pedestrians <br /> <br />A trail currently exists form CSAH t 16 to CSAH 5 on the west side of TH 47 with part of this <br />trail segment following Xldmo Street. A trail also exists along the Amber Ridge and WilloW' <br />Ridge developments. As part of the project, it is proposed to complete the missing segments of <br />the trail to make it continuous form CSAH 116 to t53rd Avenue NW. <br /> <br />Construction Impacts <br /> <br />Construction related impacts such as dust, erosion and noise will occur with this project. No <br />unique concerns are anticipated and standard noise, dust and erosion control procedures and <br />specifications will be followed. No excess material or borrow site problems are anticipated. <br /> <br />Traffic impacts due to the construction are also anticipated. The roadway is proposed to remain <br />open during construction although delays are expected. <br /> <br />Cultural Resources <br /> <br />A survey will be conducted to determine the existence of any archaeological or historic resources <br />that would be impacted by the proposed roadway improvement project. The State Historic <br />Preservation Officer w/li review the survey and impacts on any identified cultural resources will <br />be avoided, minimized, or mitigated as required by state and federal law. <br /> <br />Noise <br /> <br />The extent of noise impacts along the corridor will be determined as part of the ongoing <br />environmental study. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.