My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/25/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 02/25/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:13:47 PM
Creation date
9/19/2003 9:14:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/25/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steve Jankowski <br />Page 2 <br />February 20, 1997 <br /> <br />Prepare necessary submittal information to the Minnesota Pollution <br />Control Agency, and the Department of Health and the Metropolitan <br />Council Wastewater Division. <br />Prepare final cost estimate. <br />Solicit and obtain bids. <br />Provide project observation by registered professional engineer. <br />Review shop drawings, change orders, prepare and certify payment <br />requests. <br /> <br />Estimated "not to exceed" cost of basic services: $5,900 <br /> <br />II. Technical Services <br /> <br /> A. Services provided by Hakanson Anderson Associates, Inc.: <br /> <br /> · Provide construction staking and inspection. <br /> <br /> · Preparation of as-built plans. <br /> <br /> Estimated cost of technical services provided by <br /> Hakanson Anderson Associates: ~ 11,500 <br /> <br /> B. Services provided by STS Consultants, Ltd.: <br /> <br /> · Soil borings <br /> <br /> · Compaction testing. <br /> <br /> Estimated cost of technical services provided by STS Consultants: $1,800 <br /> <br />All of the above costs are based on our current hourly rates and the estimated cost of <br />the basic engineering services is a not to exceed cost. The cost of the technical <br />services is an estimated cost and will depend on the contractor and the weather <br />conditions during construction. We will bill the cost of soil borings and compaction <br />testing at the actual cost plus five percent for administration. <br /> <br />Hakanson <br />Anderson <br />Assoc., Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.