Laserfiche WebLink
CASE # <br /> <br />REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING SERVICES FOR <br />STREET AND STORM SEWER IMPROVEMENTS TO INDUSTRIAL PARK <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br />The City of Ramsey hereby solicits a proposal from your firm for professional services to <br />provide street and storm sewer improvements to an industrial park area located within the <br />Northwest Quarter of Section 35. A location map of the improvement areas is attached. The <br />improvements are located in two separate areas. The Oak Ridge Industrial Park is currently <br />platted and has had sanitary sewer and watermain improvements installed. However, street and <br />storm sewer will need to be installed. Street improvements will consist of 300 feet of roadway <br />and a cul-de-sac. It is anticipated that storm sewer will be installed at the neck of the cul-de-sac <br />and will drain to the east property line of the subdivision, then south and east along the property <br />line to discharge into a drainage area, currently located on Outlot A in the Business Park 94 <br />addition. No legal descriptions or easement wiI1 need to be acquired as a part of the consultant's <br />work. A preliminary drainage analysis of the area has been made for the storm sewer system. <br />The consultant will need to review this plan and design the street and storm sewer improvements <br />necessary to complete the development of the Oak Ridge Industrial Park. <br /> <br />A second element to the work will be the construction of a storm sewer adjacent to the north side <br />of the railroad tracks also illustrated on the attached location map. Presently a storm sewer exists <br />in McKinley Street, however, this storm sewer has capacity to handle only a portion of the <br />drainage from the proposed development south of McKinley Street. Five individual site plans <br />for the area south of McKinley Street have recently been prepared and are available. A <br />preliminary drainage analysis for the area has been made. The consultant will be expected to <br />review the site plans and preliminary drainage analysis in designing the storm sewer. The storm <br />sewer will discharge to a large regional basin located on Outlot D of Business Park 95, Second <br />Addition. <br /> <br />Summary of Services <br />For ali of the above described work, the consultant will (1) review preliminary drainage analysis, <br />(2) survey and design, (3) prepare plans and specifications, (4) solicit construction bids, (5) <br />provide project management, (6) Provide surveying and inspections throughout the construction, <br />and (7) prepare "as built" plans following construction. <br /> <br />Basic Engineering Services: <br /> <br />The consultant shall provide the following basic engineering services: <br /> <br />* Prepare plans and specifications for the street and storm sewer improvements. <br />· Review site plans and preliminary drainage analysis <br /> <br />I <br />I <br />I <br />I <br />I: <br />I <br />I <br />I <br />I <br />! <br /> <br />I <br />I <br />! <br />I <br />I <br /> <br /> <br />