My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 09/23/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:54:18 PM
Creation date
9/22/2003 7:34:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alliant Engineering, Inc. <br /> <br />EMORANDUM <br /> <br />TE: <br /> <br />OM: <br /> <br />BJECT: <br /> <br />September 15, 2003 <br /> <br />Dave Thorsen - Team TSP <br /> <br />Mark Rausch <br /> <br />PACT Charter School <br /> <br />e following issues included in the letter addressed to Mr. Alan Linoff have been addressed: <br /> <br />ility Plan · Determination of the type of heating/cooling will need to be determined by Team TSP. <br /> · Reference to the City of Little Canada in the utility notes has been changed to Ramsey. <br /> <br />mdscaping <br /> The number of trees on the site has been increased to 67 from 62. <br /> · The number of shrubs is at 353 which exceeds the 335 that are required. <br /> Additional shrubs have been included along Peridot St. and Ramsey Blvd. to provide <br /> undercover. <br /> · The use of Concorde Barbary shrubs will be replaced with another approved shrub type. <br /> <br />,rainaae Plan <br /> · Coordination with URS and Polaris Group will continue to ensure that the 10-yr tailwater <br /> elevation will not exceed parking lot low points. <br /> · Possible solutions include: <br /> a) Raising the building - results in raising low points but also raises parking lot in <br /> relation to surrounding streets. <br /> b) Move catch basins on east side to curb line in drop off area- will raise catch basin <br /> elevation but will mean students may have to walk through rain filled gutters during <br /> storms <br /> c) Pond high water elevations are lowered - can maintain current design <br /> d) Combination of all a, b and c. <br /> <br />233 Park Avenue South, Suite 200, Minneapolis Minnesota 55415-1108 <br /> Phone 612.758.3080, Fax 612.758.3099 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.